Swindon Borough Council - Highway Maintenance Term Service Contract 2024 - 2029

Award

Value

£28,000,000

Classifications

  • Construction work for highways, roads
  • Road construction works
  • Main road construction works
  • Roundabout construction work
  • Road-maintenance works
  • Footpath construction work
  • Cycle path construction work
  • Road-surface painting work
  • Paving and asphalting works
  • Carriageway resurfacing works
  • Dual carriageway construction work
  • Single carriageway construction work
  • Surface work for streets
  • Pedestrian ways construction work
  • Parking-lot-surface painting work
  • Foundation work for streets
  • Foundation work for footpaths
  • Road junction construction work
  • Highway maintenance work
  • Roadworks
  • Road-repair works
  • Surface work for highways
  • Verge maintenance work
  • Resurfacing works
  • Surface work for footpaths
  • Erection of road-barriers
  • Grade-separated junction construction work
  • T-junction construction work
  • Paths and other metalled surfaces
  • Various surface works
  • Installation of road signs
  • Installation of bollards
  • Installation of road signals
  • Foundation work for roads
  • Crossroad construction work
  • Construction work for highways
  • Traffic-calming works
  • Surface work for roads
  • Pedestrian zone construction work
  • Installation of safety equipment
  • Installation of street furniture
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for highways

Tags

  • award
  • contract

Published

1 year ago

Description

Swindon Borough Council invites expressions of interest from suitably qualified and
experienced service providers for the provision of a 5 (Five) year Term Maintenance Contract
which will include, but is not exclusive, to drainage minor works, signage replacement,
resurfacing, structural patching of sections of roads, Microasphalt, Stone Mastic Asphalt,
Hot Rolled Asphalt, Footway slurry sealing in Swindon which have been identified as in need
of highway maintenance as detailed in the respective specification and drawings (including
the provision of all necessary traffic management to complete the works).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

DfI TRAM Road Asset Management - Surface Dressing Framework

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing. The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works. The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k. Area Lots are: SDF S2 - Newry, Mourne and Down / Ards and North Down; SDF W2 - Derry and Strabane / Fermanagh and Omagh; SDF S1 - Armagh, Banbridge and Craigavon; SDF W1 - Mid Ulster; SDF N1 - Causeway Coast and Glens; SDF N2 - Mid and East Antrim / Antrim and Newtownabbey; SDF E1 - Belfast / Lisburn and Castlereagh. Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).

Katy Reed

Published 15 hours ago
Open

DfI TRAM Road Asset Management - Surface Dressing Framework

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing. The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works. The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k. Area Lots are: SDF S2 - Newry, Mourne and Down / Ards and North Down; SDF W2 - Derry and Strabane / Fermanagh and Omagh; SDF S1 - Armagh, Banbridge and Craigavon; SDF W1 - Mid Ulster; SDF N1 - Causeway Coast and Glens; SDF N2 - Mid and East Antrim / Antrim and Newtownabbey; SDF E1 - Belfast / Lisburn and Castlereagh. Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).

Katy Reed

Published 15 hours ago
Open

Katy Reed

Published 15 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Miss Heather Lane

[email protected]

+44 7823525190

[email protected]

+44 1373836182

[email protected]

+44 7823525190

Timeline complete

Publish
Bid
Evaluate
Award
Complete