Capital Surfacing Project 2024/25 (Phase 2)

Award

Value

£277,895

Classifications

  • Construction, foundation and surface works for highways, roads

Tags

  • award

Submission Deadline

11 months ago

Published

9 months ago

Description

The project is a proposal to provide inlay resurfacing to a number of key routes around the area of Blackburn with Darwen, during the school summer holiday period.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

A38/A4019 junction improvements at Coombe Hill retender May 2025

The A38/A4019 junction improvements works are located at the junction of the A38 with the A4019 west of M5 Junction 10 at Coombe Hill. This scheme is part of the M5 Junction 10 Portfolio which Gloucestershire County Council (GCC) obtained Housing Infrastructure funds for from Homes England. The Scheme comprises improvements to the existing junction of the A38 and A4019 at Coombe Hill, consisting of the replacement of the existing left turn lane from the A38 onto the A4019 with a longer signal controlled left turn lane, and improved facilities for pedestrians and cyclists. GCC are looking for a Principal Contractor to deliver the construction phase of this scheme. Summary of Construction Phase key deliverables are as follows: - the diversion of existing utilities affected by the Scheme; - widening the existing carriageway to accommodate longer turning lanes; - constructing new traffic islands; - widening the existing footways to provide unsegregated shared use path for pedestrians/cyclists and constructing a new segregated footway/cycleway; - installing new traffic signals (including controller) and vehicle/non-motorised user traffic counter sensors; - installing new lighting columns; - overlaying the existing carriageways and resurfacing the existing footways; - installing new road markings and traffic signs; - construction of an attenuation basin to the south of the A4019 within an agricultural field. A new field access point into the field will also be created; and - Landscape planting The proposed procurement route will be a single stage tender process, using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.

Katy Reed

Published 6 days ago
Open

A38/A4019 junction improvements at Coombe Hill retender May 2025

The A38/A4019 junction improvements works are located at the junction of the A38 with the A4019 west of M5 Junction 10 at Coombe Hill. This scheme is part of the M5 Junction 10 Portfolio which Gloucestershire County Council (GCC) obtained Housing Infrastructure funds for from Homes England. The Scheme comprises improvements to the existing junction of the A38 and A4019 at Coombe Hill, consisting of the replacement of the existing left turn lane from the A38 onto the A4019 with a longer signal controlled left turn lane, and improved facilities for pedestrians and cyclists. GCC are looking for a Principal Contractor to deliver the construction phase of this scheme. Summary of Construction Phase key deliverables are as follows: ? the diversion of existing utilities affected by the Scheme; ? widening the existing carriageway to accommodate longer turning lanes; ? constructing new traffic islands; ? widening the existing footways to provide unsegregated shared use path for pedestrians/cyclists and constructing a new segregated footway/cycleway; ? installing new traffic signals (including controller) and vehicle/non-motorised user traffic counter sensors; ? installing new lighting columns; ? overlaying the existing carriageways and resurfacing the existing footways; ? installing new road markings and traffic signs; ? construction of an attenuation basin to the south of the A4019 within an agricultural field. A new field access point into the field will also be created; and ? Landscape planting The proposed procurement route will be a single stage tender process, using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete