Office Roof Replacement Works

Award

Value

£75,000

Classifications

  • Roof

Tags

  • award

Submission Deadline

3 months ago

Published

2 months ago

Description

Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations. While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.

PDD plans to complete a large refit by March 2025. PDD will become the engineering powerhouse that it once was, but with more abilities than ever before. This facility has primally been ship repair only, but now
we are supporting multiple areas of the market, ship repair, ship building, mass fabrication and most importantly training and skill development.

This capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund, will see the site brought up to an even playing field with the rest of industry, with new, safer lifting systems
and the dilapidations being rectified. We will see our efficiency drastically increased which in turn will assist in reducing our carbon footprint.

As part of this refit, PDD wishes to replace the roof of the office building.

Penzance Dry Docks is seeking a contractor to undertake the works to re-roof the current office building, subject to planning approval. 

No asbestos has been identified by the client, but Contractor will be
required to undertake necessary due diligence to confirm.

Specific requirements of this tender, which the tenderers will need to satisfy, and the successful tenderer
will be required to deliver on are:
 Work to be carried out during normal working hours.
 Roofing to be completed by October 2024.
 Roof dimensions: estimated 20.4M long, 6.5-8.2m wide. A-frames are 2m apart. This is best rough measurements for BOTH roofs, and the Contractor will be responsible for confirming sizes and
quantities as part of their tender submission.

More details in the specification.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete