Fire Door Survey and Repairs

Award

Value

£412,928

Classifications

  • Fire doors

Tags

  • award

Submission Deadline

1 year ago

Published

8 months ago

Description

For the provision of fire door inspections and remedial works.

The contract term is 12 months with the option to extend for a further 12 month period. 

This contract was awarded through the Fusion21 Building Safety and Compliance
Framework, Lot 8 - Passive Fire Protection - Fire Doors as a direct award.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

MKCC Fire Door Replacements

Milton Keynes City Council (the Council) are required to meet all statutory obligations in relation to our Housing stock. The Housing stock asset management function is controlled by the Council's Housing Maintenance and Investment (HMI) team. The Council are currently out to tender for the provision of Fire Door replacements for block properties, including dwelling entrance, internal communal, service cupboard doors, and loft hatches. All sites are within the Milton Keynes postal code region. Any sites which fall outside of this region will be advised in the mobilisation period. The Council proposes to enter into a contract that will be for an initial term of 2 years with an option for the Council to extend for 2 years with the successful tenderer (Service Provider) unless terminated in accordance with the Conditions of Contract. The estimated value for Fire Door Replacement contract is £5.75M (ex. VAT) for the maximum potential contract period of 4 years. The spend under the contract is dependent on the quantities of installations ordered during the term of the Contract. The estimated value is indicative only, and the Council does not guarantee to Tenderers the volume of installations ordered. The Council has not engaged with the market prior to issuing the ITT as it has already developed the most appropriate specification for the works they require to be procured. The requirements for Fire doors are set out in Building Regulation (Fire Safety: Approved Document B), and other legislation with robust British Standards in place for the testing and certification of fire doors and therefore there is a robust specification in place meeting the Council's needs.

Katy Reed

Published 1 day ago
Open

RBC - CS - Fire Safety and Compliance

Reading Borough Council are seeking providers to deliver a range of fire safety and compliance related goods, works and services, including: Lot 1 - Risk assessments, Inspections and surveys • Fire risk assessments • Building Fabric Fire compartmentation surveys • Fire door (flat entrance and communal) inspections. Lot 2 - Remediation works • Fire door-set supply (with Primary Test Evidence) • Fire door installation and compartmentation remedial works Lot 3 - Fire Safety Equipment (Active & Passive) Maintenance. • Fire alarm and refuge alarm maintenance • Emergency lights maintenance • Wet and dry riser maintenance • Fire extinguisher maintenance • Automatic opening smoke ventilation maintenance • Fire sprinklers and misting systems maintenance • Bin chute maintenance The required goods, works and services are to be provided and carried out across the entirety of the high, medium and low risk blocks of flats, houses of multiple occupancy (HMOs), sheltered housing schemes and supported housing stock within the portfolio managed by Reading Borough Council. The schedules setting out the level of work for each contract year can be found in the respective specifications for each area of the contract. Tenders are invited for the supply of: Lot 1 - Fire Risk Assessments, Fire Compartmentation Surveys, and the Fire Door Inspection Programme Lot 2 - Supply of Fire Doors, Fire Door Installation and Building Fabric Compartmentation Remedial Works Lot 3 - Fire Alarm and Refuge Alarm Maintenance, Emergency Lighting Maintenance, Wet and Dry Riser Inspection, Servicing and Maintenance, Fire Extinguisher Inspection, Servicing and Maintenance, Automatic Opening Smoke Ventilation System Inspection, Service and Maintenance, Bin Chute Maintenance, and Fire Sprinkler and Misting Systems Maintenance There are three lots that form this tender; whilst bidders can submit bids for each of the lots, there are limits to the lots that can be awarded to the same bidder, namely: The same bidder can win lot 1 and lot 3 The same bidder can win lot 2 and lot 3 The same bidder cannot win lot 1 and lot 2 In the event that the same bidder is the highest scoring bidder for lot 1 and lot 2, they will be asked to choose their preferred lot, and the next highest scoring bidder will be appointed to the lot not chosen.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete