Rooftop Solar PV

Award

Value

£594,102

Suppliers

Classifications

  • Building fittings

Tags

  • award

Submission Deadline

11 months ago

Published

7 months ago

Description

Siemens Rooftop Solar PV

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Fit-Out Package C4-KCSL copy

The scope of the Subsubcontract works is the provision of all necessary People, Equipment, Plant, Materials, methodology, design and detailing for the fit out and decoration works inside the envelope line as per the accompanying drawings and specifications. The works also include all required temporary works (if any), and their design, installation of, ongoing maintenance of and removal required for the safe execution of the Subsubcontract works. The end product needs to comply with the acoustics and fire performance requirements as stated in the documentation which forms part of this scope. The scope includes, but is not limited to, the following works: • Internal Wall Systems (excluding glazed systems), dry lining, shaft walls, stud partitions, bulk heads, roller shutters and IPS panelling including wall access hatches in the vertical plane. Internal wall systems to include suitable support to doors (IWS); • Acoustic Lining (AL); • Security Lining* (SL); • Raised Access Flooring systems including access hatches and outlets (RAF); • Suspended Ceilings (SC) • Formation and fitout of offices, toilets, and kitchenettes (Office) • Fixtures, Fittings & Equipment (FF&E) • Wall and floor coverings including, but not limited to, ceramic tiles, ceramic wall laminate, rubber flooring, skirtings, internal DPM flashings, corduroy/tactile warning surfaces etc (COV); • Wall, floor, soffit, stair and ramp finishes including, but not limited to, sealer, paint, resin and internal mastic works excluding intumescent mastic to doors and windows (PAINT). • Screeding, insulation and DPM works to buildings excluding West Core, East Core, North Portal, South Portal and OOC Interface Substation (SCREED)

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete