Ormskirk Bridges Restoration Scheme

Award

Value

£1,300,000

Suppliers

Classifications

  • Construction work for bridges

Tags

  • award

Submission Deadline

1 year ago

Published

10 months ago

Description

The Authority are looking to undertake major maintenance works at Derby Street Railway Bridge and Moor Street Railway Bridge in Ormskirk Town Centre. Both bridges are listed structures that run parrallel to each other and carry the public highway over the Ormskirk to Liverpool railway. The work on Derby Street Railway bridge involves strengthening the structure whilst an existing extension on Moor Street bridge is to be taken down and rebuilt. Railway possessions will be required throughout the duration of the contract to facilitate the works.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Culvert Repair Works, Choats Road, Barking

The Choats Road culvert structure consists of a twin bore corrugated steel Armco type culvert Located on Choats Road in Barking, London. Each of the culverts is 36.6m long, with a width of approximately 2.8m and height of 1.5m. The culvert has structurally failed at sections along its length. Due to the nature of the failure a road load restriction (7.5tonnes) has been put in place to minimise the risk to the public. The Council is seeking to appoint a contractor to design and install a GRP culvert lining solution that will restore capacity to the culvert.A comprehensive solution that meets all requirements is being sought. The works involves a Pre-design Phase, Design Phase and Construction Phase. The tenderers will complete the Pre-design Phase and Design Phase of the works before commencing the Construction Phase of the works. In the Pre-design Phase, the contractor is required to undertake a survey of the culvert to confirm its dimensions and the nature of the construction of the river bed. A Flood Risk Activity Permit for this work has already been granted by the Environment Agency. During the Design Phase, the contractor must provide design and construction information for the Council's Phase 2 Flood Risk Activity Permit application which would enable procurement of necessary permissions from the Environment Agency, and prepare an approved AIP for the Choats Road Culvert strengthening per DMRB CG300. They must also deliver detailed designs, specifications, certificates, and temporary works design based on the AIP once approved. During the Construction Phase, the contractor is required to cleaning the culvert, install a GRP lining, manage site preliminaries, provide temporary works, and conducting pre- and post-installation surveys. During the works the contractor is required to provide reasonable access to the client and appointed agents to undertake environmental surveys in support of Environment Agency Permit applications

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete