GB-Newcastle: T22/0056 - Demolition of Wynne Jones Building

Award

Value

£1,160,169

Suppliers

Classifications

  • Building demolition and wrecking work and earthmoving work

Tags

  • award

Submission Deadline

1 year ago

Published

3 months ago

Description

NOTE: This notice was updated on 31 July 2024 for the following reason: Values quoted include VAT.
      Addition £191,912.47 added to the contract sum to cover several ERIs issued alongside the original contract to amend the hoarding system, produce a time lapse of the demolition, remove additional asbestos found on 3rd floor and in WJN305, extend cut lines, removal of ground slab, prelims for the additional works and the production of a pile mat.(Demolition works including partial removal of upper frame and floors, ground floor, substructure and below ground obstructions, plus removal of all asbestos, desk study / survey, soft strip works, demolition of all brickwork to the perimeter of the building, all external cladding, internal partitions.
      
      In-situ plotting of piled foundations and benchmarks, protection to Central Motorway retaining wall and Northumbrian Water sewers.
      
      Works to or affecting new and / or existing services including drainage, recycling off-site of demolition arisings; Testing and certifying as Type 1 sub-base material (where suitable) and temporary protection to structure that is to be retained at completion of demolition works.
      
      ADDITIONAL WORKS - Further investigations of the Wynne Jones structure once initial demolition works were completed revealed considerable constraints with the existing concrete frame. These constraints would have led to inefficient floorplates and floor to ceiling heights that wouldn't comply with Building regulations in certain areas. Therefore, it was no longer viable to retain the structure and the decision was taken to demolish the full building.)

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath

Tai Tarian is seeking to award a Contract for New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath, including managing demolition within an occupied area, to support Tai Tarian in the delivery of its development programme. The work comprises of the demolition of 2 existing properties to form access for the construction of 12 houses and 10 apartments and associated external works, drainage and incoming services. Tenderers should note that a site visit may be made at any time. Tenderers are responsible for obtaining any further information including inspection of the site (and will have deemed to have done so) to ensure sufficiency of your Tender. Tenderers must complete the Contract Sum Analysis (Appendix 2 – Contract Sum Analysis) in the format provided. A breakdown of the external works costs and preliminaries is also required. Collateral warranties will be required from all designers and will only be accepted in the format contained in Appendix 1 – Contract Documentation. Tenderers are reminded that it is expected that the Tenderers proposals will mirror the Employers Requirements. Any alterations must be clearly identified. A S104 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums. It is anticipated that a S278 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums. The client has commenced with the SAB application, and it is hoped that this will be in place prior to signing of contracts. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees but can exclude any surety costs or commuted sums. Tenderers should note that the specification documents must be complied with fully and no deviation from the listed items will be accepted, unless agreed with Tai Tarian prior to installation.

Tai Tarian Ltd

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Terri Hudson

[email protected]

447548775792

Timeline complete

Publish
Bid
Evaluate
Award
Complete