UKRI-3274 Professional Services for the Design, Project Management and Cost Management of HV/LV Infrastructure Project Works

Award

Value

£950,000

Suppliers

Classifications

  • Calculation of costs, monitoring of costs

Tags

  • award
  • contract

Published

1 month ago

Description

UKRI-STFC Rutherford Appleton Laboratory site has 50 substations with a total demand of 24MW and c. 27km of HV cabling.  Some of this infrastructure is original circa 60 years old.
STFC have identified a substantial maintenance backlog list, which forms the focus of the request for the support of a specialist HV/LV Design Consultancy, with large, complexed site Infrastructure design experience. The list is comprised of a large variety of interventions to the electrical infrastructure such as cable overlays for capacity, replacements for service life, and remedial works following faults on the network.   
There is a clear need for a long-term infrastructure masterplan to address this deficit. At this time, we understand that planning the maintenance work should be mindful to the need for a masterplan. The supplier is to be capable to design and deliver Infrastructure Master planning especially where we are making significant investment into the existing infrastructure.
https://www.ukri.org/who-we-are/procurement-contract-transparency-data/

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete