Provision for Replacement of 2No Ground Source Heat Pumps at Lee Valley White Water Centre - AWARD

Award

Value

£0

Classifications

  • Electrical installation work of heating and other electrical building-equipment

Tags

  • award

Submission Deadline

4 months ago

Published

4 months ago

Description

Lee Valley Regional Park Authority ("the Authority") has a requirement for the replacement of two Ground Source Heat Pumps at its White Water Centre based in Waltham Cross, Essex. The venue is a World Class sports venue and is the Legacy from the 2012 London Olympic Games.
      
      The two GSHP's are located in the plant room and they extract the water for the heating and cooling from these pumps. It should be noted that the updated model of these GSHP's has fundamental changes to its connections and as such extensive modification will be required to the pipework within the plant room, which is expected to take between 4- 6 weeks. Its is therefore necessary for the works to be carried out in the summer months.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete