Description

Scope of Works:  
      
The station is the London interchange station of the UK's second high-speed railway. It will be located on the site of the now demolished Old Oak Common Railway Depot, bounded by the Crossrail Depot to the north, the London Overground West London line to the east, the Intercity Express Programme Depot to the south and Old Oak Common Lane to the west. HS2, Great Western Main Line (GWML), Crossrail and Heathrow Express services will be served by the new Old Oak Common Station.  
      
HS2 Old Oak Common Station will provide a state-of-the-art gateway to London and the wider area, with efficient intermodal interchange with rail, taxi, cycle and pedestrian modes.  
      
Urban Realm packages involve all the outside space aside any building structures, spanning over an area of approximately 50000m2. 
      
BBVS is seeking to contract under NEC3 Option A with a contractor to deliver the first sub package of works that includes the following elements in summary: 
      
Normal and lightweight fill earthworks (more than 75k m3), and associated reinforced concrete retaining structures  
      
Excavation works and reinforced concrete structure for DNO housing building 
      
Boundary fences and associated foundation pads & retaining walls, inclusive of earth bonds. 
      
Underground reinforced concrete attenuation tanks  
     
Overground reinforced concrete attenuation tanks 
      
Reinforced concrete foundation slabs for cycle hub, catering building and water gardens 
      
Deep & surface water drainage, fire hydrant network, water networks, LV/HV/ other ducting & other associated infrastructure such as utilities access chambers  
      
The scope of the subcontract includes but not limited to:    
The provision of all necessary People, Equipment, Plant & Materials (temporary or permanent) to deliver RIBA 5 Design, mock-ups, temporary works, fabrication, installation, & certification of the associated works 
      
 The Subcontractor will need to demonstrate that they have the capabilities & resources to deliver the size and nature of this project in a rail environment.  
      
The Subcontractor will be required to produce & submit 2D/3D designs in native DGN files, working on projectwise and other software platforms.       
The Subcontractor will be required to liaise with organisations such as Transport for London, Crossrail Depot, Network Rail & Thames Water. 
      
Webinar 
For further information and visuals, please watch our BBVS Webinar recording on the whole Urban Realm activities: https://attendee.gotowebinar.com/recording/4015116724636723457 
Please note, all information included within the presentation is indicative and is for information purposes only. Also, please note the procurement slides are subject to revision.   
      
Programme 
      
It is currently anticipated that the site works will be predominantly completed between Q3 2024 and Q4 2027, with a preconstruction period prior to site activities.

Additional information: No Documentation is included at this point.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

National Trust NI - Divis - A View to the Future Works Project

Divis - A View to the Future Project has been made possible with The National Lottery Heritage Fund. Thanks to National Lottery players, we are improving access, enhancing engagement and ensuring the long-term protection of this unique landscape. This Request for Proposal (RFP) sets out the Trust's situation and objectives in respect of the "Divis - A View to the Future Project". The proposed works within this project lie across Divis and the Black Mountain, Northern Ireland, with four main areas of focus at the visitor hub and entrance from Divis Road, the Summit, the boardwalk south of Divis masts, and the existing farm track connecting the eastern side of the site to the Glencairn Road. Out with these areas, elements of signage and interpretation are required along the walking trails. The RFI seeks initial information from a range of suppliers as to possible solutions, capacity, capability and relevant experience. This two-stage procurement process is for the appointment of a Main Contractor / Principal Contractor to deliver the construction works associated with capital works outlined in the tender pack. Stage One (RFP1) seeks initial information from a range of suppliers as to capacity, capability and relevant experience. The successful bidders from the RFP1 process will be invited to the second stage, RFP2, where a Proposal Costing will be requested. Tender Timeline Event Anticipated Dates Request for Proposal (RFP1) issued 25th April 2025 RFP1 Clarification Period Closes 16th May 2025 (12pm) Return of RFP1 23rd May 2025 (4pm) Request for Proposal (RFP2) issued 02nd June 2025 Return of RFP2 01st July 2025 (12pm) Award Contract August 2025 Contract Start September 2025 The tender is being conducted via the Proactis Plaza portal. http://www.proactisplaza.com/ Search for The National Trust in the opportunities section and follow the instructions. Register your interest to access the tender pack.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Manish Tailor

[email protected]

7738982498

Timeline complete

Publish
Bid
Evaluate
Award
Complete