Highways Consultant for Economic Appraisals

Complete

Value

£107,848

Classifications

  • Highways consultancy services

Tags

  • tender

Submission Deadline

11 months ago

Published

11 months ago

Description

Waterman Infrastructure & Environment Limited have provided resources historically to support scheme appraisal activities and ensure that appropriate data is collected to inform the overall evaluation and monitoring for each project/work package, undertaking value for money assessments, business case development, monitoring and evaluation plans, modelling, economic appraisals as per the stipulated funding stream requirements. They therefore have an understanding of the detail and work completed to date on previous and current projects and funding bids and would therefore be best placed to support the existing in progress and new projects during the contract term in the most efficient way. Direct Award allows seamless continuity of the commission and is within the scope of the ESPO Framework rules which allow awards to the supplier which best suits the needs of the authority using the published rates.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Sutton Local Plan Strategic Transport Assessment

The project is to prepare and finalise a Strategic Transport Assessment to support the preparation of the new Sutton Local Plan. The scope of work is expected to cover the following (the full tender specification should also be referred to): The purpose of this work is to demonstrate how the transport network is likely to operate in response to the changes in travel behaviour arising from development, including allocated sites, under the proposed Local Plan and supporting evidence base documents. The Strategic Transport Assessment will include transport modelling, and also incorporate separately published Transport for London / developer models and analysis to assess the effects of the development planned under the Local Plan on the local and strategic highways network in the borough, as well as public transport and active travel up to the end of the proposed plan period. It will recommend new projects and mitigation to address impacts of the Local Plan and other planned growth nearby. The Strategic Transport Assessment should assess impacts related to the highway network (strategic and non-strategic); public transport (bus, rail and tram), and active travel (walking and cycling). The Strategic Transport Assessment should be informed by the National Planning Policy Framework (NPPF) as well as the Department for Transport Transport Analysis Guidance (TAG) and Transport for London Transport Assessment guidance. As such, the Strategic Transport Assessment must: cover the whole plan area, including existing areas, growth areas and proposed site allocations; review the locations of proposed site allocations, growth areas/corridors or clusters of development, and potential options for the provision of sustainable transport and transport networks to serve them; identify transport issues as they affect all modes and freight, including accessibility, road traffic congestion, mobility, overcrowding, safety, air quality and noise pollution, affordability, carbon reduction; develop potential options or interventions to address the issues identified and any gaps in the networks in the short, medium and longer term; identify options for maximising active and sustainable travel; and identify options to improve the accessibility of transport nodes, such as rail and bus stations to facilitate integrated solutions. Please refer to the specification in the attachment section on the portal for full details.

Katy Reed

Published 12 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete