DfI TRAM T-1142 Term Contract for Environmental Maintenance

Complete

Value

£41,250,000

Classifications

  • Planting and maintenance services of green areas
  • Works for complete or part construction and civil engineering work
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Engineering works and construction works
  • Tree pruning and hedge trimming
  • Demolition, site preparation and clearance work

Tags

  • tender

Submission Deadline

1 year ago

Published

1 year ago

Description

The Term Contract for Environmental Maintenance cover the following Local Government Districts EME1 - Belfast (North and South); EMN1 - Causeway Coast and Glens; EMS1 - Armagh, Banbridge and Craigavon; EMW1 - Cookstown, Dungannon and Magherafelt; EMW2 - Derry and Strabane Within each Contract Area, the works to be undertaken under this Contract may include, but not be limited to, the following principal work activities which are provided by way of example: A. Maintaining grass in both urban and rural areas adopted by a relevant roads authority including experience of undertaking appropriate Temporary Traffic Management on a live trafficked public road. B. Controlling weed growth in areas adopted by a relevant roads authority including experience of undertaking appropriate Temporary Traffic Management on a live trafficked public road. C. Cleaning, jetting and inspection of the roadside drainage system in areas adopted by a relevant roads authority including experience of undertaking appropriate Temporary Traffic Management on a live trafficked public road. Further ancillary works may be asked of the successful Economic Operator such as. 1. Maintaining grass areas using tractor / mowers 2. Maintaining grass areas using small motorised units / strimmers 3. Cleaning of road and footpath gullies 4. Jetting of drainage systems and inspection chambers 5. Weed Control to adopted areas 6. Emergency Responses (Grass Cutting / Gully Cleaning) 7. Traffic Management on Roads as defined in the Roads (NI) Order 1993. 8. Cut, remove or maintain trees / hedges and associated works. 9. Edge ploughing 10.Removal of advertising signs 11.Cleaning of road signs and marker posts

Similar Contracts

Open

Netstakes Retaining Wall Gunnislake - Crest Anchors Steel Reinforcement

Corserv Solutions Ltd Cormac division wish to appoint a suitably experienced and qualified contractor to undertake the supply and installation of soil nails, crest anchors, erosion control mesh, steel reinforcement, concrete and shotcrete to stabilise the embankment on the eastern side of Calstock Road in specific locations from Chainage 0 to 95, at Gunnislake, Cornwall. Corserv Solutions Limited TA Cormac Solutions are the Principal Contractor. The subcontractor shall agree setting out positions of soil nails and sacrificial anchors with the Geotechnical Engineer. The subcontractor shall provide all necessary labour, plant/equipment, materials and consumables to execute the works as per the works information within, whilst considering all other documentation and information contained within the PCI and appendices. The Subcontractor must assess the works area and access restrictions, ensuring suitable plant and construction methodology. Consideration shall be given to the local area; protection of footpaths from spraying activities. The works include the installation of soil nails to the required design levels, placement of erosion control mesh with boundary ropes inclusive of cutting to size and bearing plates and lock nuts to hold in position. Sacrificial testing of soil nails and issue of results. Take down and set aside existing stone facing for future use. Installation of stone facing by others. Excavation and installation of reinforcement and concrete for foundations. Placement of reinforcement, weep holes and spraying of concrete. A BT Openreach cable is present within the works area, and a low voltage overhead cable above. Subcontractor to review all PCI and Appendix Information, noting the GI report, ensuring sufficient embedment whilst achieving desired design finish levels. Subcontractor to note sensitivity of environment and ecology, making provision accordingly. The Subcontractor shall provide all relevant details of the method of piling, the plant and monitoring equipment to be used to the Design Engineer – Programme of works to be submitted. Full copy of test results and site records to be issued as per the specification and upon completion for inclusion in the as-built file. NEC 3 Short Subcontract BT Openreach Buried Cable / 600mm easement WPD Low Voltage Overhead Cable Cormac to provide required TM The intention is to award the contract to the most advantageous tenderer based on 20% Quality and 80% Price. To access the online question template and supporting documents, express an interest and then click the "start my response" button

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete