Project Manager for LUMS Refurbishment (Phase 2 East) Project 2024 - AWARD

Award

Value

£0

Suppliers

Classifications

  • Construction project management services

Tags

  • award

Submission Deadline

7 months ago

Published

5 months ago

Description

Lancaster University is inviting tenders on the terms set out in this Invitation to Tender (ITT) for a Project Manager for LUMS Refurbishment (Phase 2 East) Project 2024 working with a Quantity Surveying Services Consultancy on behalf of Lancaster University from Stage 5 to 7. 
      
      Lancaster University's Management School (LUMS) have embarked on an ambitious programme to redevelop and expand the existing management school complex of buildings. A first phase of the Management School redevelopment (LUMS01) has been successfully delivered to provide the new built West Pavilion. The second phase of the development (LUMS02) consists of the refurbishment of existing buildings Gillow House, Graduate Management School, Lecture Theatres 5-8, Gillow Quad and Lancaster Leadership Centre.  The West Pavilion, Lancaster Leadership Centre and Lecture Theatres 5 to 8 will remain operational for the full duration of the works.
      
      To develop the project, LU appointed a Principal Contractor on a Pre-Construction Service Agreement to review the previous design and develop the design to respond to the future requirements for LU following the pandemic and any changes are developed to RIBA Stage 4. As the design develops, a phasing programme and costing process will be developed however the current programme is included in this document for information.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Project Management re. Brooksby Building BACS additional works

The contract is for a single supplier to provide Project Management in relation to the Project Management Brooksby Building BACS additional works Project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. The Brooksby Building at The Pirbright Institute (Pirbright) will be a high containment large animal facility for work on high consequence pathogens such as foot-and-mouth diseases virus (FMDV), when fully operational in 2026. As part of the post-construction 'Day 2' works there is a requirement to carry out additional works to the Building Automation and Control System (BACS) within the Brooksby Building to ensure it is fully aligned with the primary system used across the rest of the Pirbright site. The following packages of work have been funded and will be procured by Pirbright, with technical support from the Project Manager, and will require on-site project management to ensure all interdependencies, risks and issues are managed appropriately for the duration of the project: • Recategorisation of BACS alarms to align with Pirbright site standard and integration to Pirbright Alarm Management System (AMS) of all BACS alarms within Brooksby (Work Package 1) • Provision, installation, testing and commissioning of an additional 140 no. (approx.) BACS Input/Output Alarm Points (Work Package 2) The Scope of Services for this contract is as follows: - Full Project Management to include: - Management of programme for packages of work listed above - Management of sub-contractors, these will be appointed directly by The Pirbright Institute - Management of interdependencies - Principal point of contact for the project, liaising with internal and external stakeholders as required - Reporting: Production of Project Highlight Report on a monthly basis, on Pirbright template document - Responsible for ensuring project benefits are realised - Management of project budget - Responsible for monthly cashflow forecast reporting - Proactive management of project risks and issues, owner of Project Risk Register and Issues Register - Regular site attendance to ensure project is progressing as per programme - Quality Assurance - Site attendance at monthly Project Board meetings - Handover of all documentation in line with Pirbright Project Information File (PIF) structure. A Sample PIF is attached in Appendix E1B.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Ben Askew

[email protected]

01524 592086

Timeline complete

Publish
Bid
Evaluate
Award
Complete