MWF - Liphook Infant and Junior School - Suitability Enhancements - AWARD

Complete

Value

£862,378

Classifications

  • Construction work

Tags

  • awardUpdate

Submission Deadline

1 year ago

Published

1 year ago

Description

Dear Sir/Madam,
      
      In accordance with the Minor Works Framework 2022 - 2026 - lot 2 you are invited to tender for the Suitability Enhancements at Liphook Infant and Junior School and have been supplied with the attached documents.
      
      Please download all the documents and read VERY carefully.
      
      Opting In and Out
      Please note you are required to 'Opt In' before you can access the 'My tender Return' to start populating your response. 
      
      The 'Opt Out' functionality will also be available throughout the duration of the tender process. Opting out will give you the option of declaring you no longer want to receive any further communication in relation to this tender along with the opportunity of providing comments and feedback for this decision.
      You can choose to 'Opt In' at any time during the tender process if you initially decided to 'Opt Out'.
      
      Your completed tender return document(s) & form of tender should be submitted via In Tend no later than 2pm on Thursday 21 March 2024.
      
      Kind regards
      Liam Presley

Similar Contracts

Open

Ardersier Port, Phase 2 - Quay Civils (300m)

Quayside Civils (These works are the focus of this PQQ) - Setting up principal contractor welfare area including all temporary service connections, - Breaking out and disposal of concrete guide walls following installation by quay wall contractor, - Removal of piling mat, installed by Others, - Cropping of diaphragm wall to cut off level. - Reinforced concrete capping beams, to both quay and anchor wall, with a design life of 100 years to tie in with the Phase 1 quay, Including the supply and installation of all quay furniture cast in elements. - Removal of existing sheet pile quay wall, anchor wall and tie rods. - Excavation to tie rod level, approximately +0.0mCD, including dewatering system to facilitate, - Installation of tie rods (free-issue) between quay and anchor walls, - Backfilling above tie rods to formation level using site-won material, - 100m wide quay apron along the entire length of the new quay including capping layer and unbound stone pavement, - 250kPa uniform loading capacity, - Finished level of +6.5mCD (varies depending on drainage falls), - Installation of temporary and permanents sheet piles, - Infiltration drainage system with trenches as required, - Quay furniture including flexible mooring and berthing equipment such as pneumatic fenders, removeable bollards, and safety equipment inclusive of all associated cast in items, - Instrumentation and monitoring equipment associated with the quay wall. - Upgrades to the existing quayside which extends east beyond the new Phase 2 300m diaphragm wall and apron by approximately 758m, whilst retaining the existing quay wall, to extend the usable quayside (dredged by others). There will be a requirement for the Contractor to coordinate elements of works with the Clients quay wall and landside civils principal contractors. There is potential for the works to be varied to extend the new quay wall and quay wall civils further than the initial 300m.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Property Category Management Team

[email protected]

03707 791404

Timeline complete