A9 Dualling: Tay Crossing to Ballinluig

Complete

Value

£155,000,000

Classifications

  • Construction work for highways, roads
  • Demolition, site preparation and clearance work
  • Culverts
  • Road bridge construction work
  • Road construction works
  • Trunk road construction work
  • Road junction construction work
  • Footpath construction work
  • Cycle path construction work
  • Dual carriageway construction work
  • Access road construction work
  • Installation of road signs
  • Environmental improvement works
  • Paving and asphalting works
  • Excavating and earthmoving work
  • Landscaping work for roads and motorways
  • Roundabout construction work
  • Erection of road-barriers
  • Riverbank protection works
  • Installation of traffic monitoring equipment
  • Restoration work
  • Installation of road lighting equipment

Tags

  • tender

Submission Deadline

1 year ago

Published

1 year ago

Description

The Scope involves the design, construction, completion and maintenance of the A9 Dualling: Tay Crossing to Ballinluig project. The project forms part of the overall A9 dualling programme, which aims to improve the operational performance of the A9, improve safety for motorised and non-motorised users, facilitate active travel within the corridor, and improve integration with public transport facilities.
The project will upgrade approximately 5 miles (8.2km) of existing single carriageway, commencing just north of the Jubilee Bridge over the river Tay and ending at the southern end of the existing dual carriageway south of Ballinluig Junction. This section of the A9 is located within close proximity to a number of designated environmental sites, including watercourses forming part of the River Tay special area of conservation which are crossed by the existing A9.
The project involves, but is not limited to:
- Widening of existing A9 single carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges
- Construction of seven left-in left-out junctions
- Construction of a roundabout
- Upgrade to side roads including resurfacing or realignment and other improvements
- Construction of access roads to rural properties
- Provision of one new overbridge structure (Guay South Overbridge) and one new underbridge structure (Kindallachan Underbridge).
- Replacement and/or upgrade to a number of existing structures including culverts and Sustainable Drainage Systems (SuDS) developed in consultation with Scottish Environment Protection Agency (SEPA).
- Provision of traffic management, earthworks, retaining walls, soil nailing, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Major Refurbishment of Port Ellen Lighthouse

The primary objective of this project is to complete a full refurbishment of Port Ellen Lighthouse to preserve its structural condition, meet current safety standards, and maintain the reliable operation of the Aids to Navigation. The works will deliver a full internal and external repaint in line with the 10-year maintenance cycle, carry out essential repairs to metalwork, masonry, doors, windows and safety systems, and address any emerging defects. The outcome will extend the service life of the asset, reduce reactive maintenance requirements, and support a safe and functional environment for inspections and planned interventions. The works will be delivered with minimal disruption to operational services and in accordance with Northern Lighthouse Board procurement procedures and project governance requirements. Scope of contract This contract covers the full refurbishment of Port Ellen Lighthouse. The works include internal and external painting, repairs to masonry, metalwork, windows, doors, and other fabric elements, as well as servicing or replacement of access and safety fittings. This is a one-off project aimed at extending the operational life of the lighthouse and reducing future maintenance requirements. Details of What Is Being Procured The contract will include: •Fabrication of replacement footbridge. •Mobilise to site and establish welfare facilities. •Set up the site. •Dismantle/ remove the existing footbridge. •Install replacement footbridge. •Remove redundant solar array support beams. •Carryout ventilation improvements. •Fabricate and install storm windows. •Remove external cable tray. •Prepare and redecorate the tower internally. •Prepare and redecorate the tower externally. •Replace existing rainwater goods. •Clear the site. For more information about this opportunity, please visit the Delta eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Fabrication-work./58582B427Z To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/58582B427Z

Katy Reed

Published 22 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete