Interim Electrical Inspections/Testing (EICRs)

Award

Value

£499,000

Classifications

  • Electrical services

Tags

  • award

Submission Deadline

1 year ago

Published

10 months ago

Description

Contract to undertake domestic electrical inspections and testing (EICRs) to council owned dwellings as per works programme. A Direct Award has been made via a call-off from a Framework with Eastern Procurement Limited (EPL). 

EPL is a not-for-profit organisation offering specialist compliant framework agreements, social landlords and other public sector bodies, predominantly in the Eastern region. The council are owner members of EPL and work closely with them to create bespoke procurement frameworks. The frameworks promote value for money for the council and include SMEs and local suppliers. 

This a temporary contract arrangement. A longer term contract award under the same procurement method is due to considered by Cabinet in the summer (2024).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

BC5457 - Tir-y-Berth Primary School - LED Lighting

You are invited to submit a tender for the installation of LED lighting and associated works at Tir Y Berth Primary School, New Road, Hengoed CF82 8AU. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The Electrical Services Installer shall allow for the safe isolation, removal and disposal of existing lighting as per the associated drawings. This forms part of Caerphilly CBC LAEF/Invest to Save Scheme. - The Electrical Services Installer shall allow for the supply and installation of new LED Light fittings and lighting as per the tender drawings. - The Electrical Services Installer shall allow for the installation of new emergency light fittings. This must include all required wiring alterations, cabling, GMS containment, key switches and sundry items. - The Electrical Services Installer shall allow for the installation of new lighting controls including all wiring alterations, cabling, GMS Containment and sundry items. They should also include for the inspecting and testing all existing lighting controls, any faults found shall be reported to the Contract Administrator. - The Inspection and Testing of all lighting circuits with results being provided to the Contract Administrator on Electrical Installation Condition Report Certificate. All emergency lighting works shall have an Emergency Lighting Certificate. - The provision of record drawings and O&M manuals. - Programme to be agreed with Contract Administrator and School

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete