Description

Award Notice for the IMO Miscellaneous Major Repairs 2024 includes: 

1. Kitchen Ductwork remedial works, including final design coordination, as follows: 
- Modify existing ceiling to provide access to kitchen extract ductwork for cleaning and maintenance.
- Supply and install additional access panels within the kitchen ductwork for cleaning and maintenance. 
- Remove fire dampers from extract ductwork. 
- Replace existing kitchen extract ductwork with fire rated ductwork. 
- Replace solid ceiling for grid system in part of restaurant servery area. 

2. Replacement of existing lighting control system and light fittings to LED within, including associated final design coordination, in the Restaurant and Ground Floor entrance hall  

3. Replacement of existing fan coil unit controllers within the restaurant area with all the necessary ancillaries 
The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: 
- Undertake full detail design of all necessary modifications to existing control systems 
- Supply and install new outstation controllers within riser control enclosures 
- Supply and install new fan coil unit controllers and associated sensors 
- Modify BMS head end to fully incorporate new controllers

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

IMO Lighting & BMS 2025 (Rear Wings)

The IMO Lighting & BMS Works 2025 (Rear Wings) includes: 1. Replacement of the existing lighting control system and light fittings with LED, including associated final design coordination, across the rear wings of the Ground, First, Second, and Fourth floors. 2. Replacement of existing fan coil unit controllers on the fourth floor including all the necessary ancillaries, the work includes: - Undertake full detail design of all necessary modifications to existing control systems - Supply and install new outstation controllers within riser control enclosures - Supply and install new fan coil unit controllers and associated sensors - Modify BMS head end to fully incorporate new controllers We are looking for a Principal Contractor to deliver the full work package. It is vital that validations for the lighting upgrades areas are undertaken promptly after contract award due to material lead-times. Delays in this process may impact the project schedules. The Department has been undertaking a phased upgrade programme for the replacement of obsolete FCU controllers. To date, the programme is approximately 50% complete and all upgrades have been undertaken Knight Controls Limited, who are also the incumbent maintenance contractor. Tenders from alternative controls specialists will be accepted, however the contractor should provide relevant case studies demonstrating similar projects and experience with Siemens BMS Installations. This will require approval from the Project Manager prior to appointment The provisional timetable for this procurement is: 13 Jan 25 – Tender goes live w/c 27 Jan 25 – Site Visits Noon on Monday 10 Feb 25 – Tender deadline w/c 10 Mar 25 – DfT Issue of intention to award w/c 24 Mar – Contract Award April – Validations on site by appointed contractor July – August 25 – Works on site, London If you are interested in this opportunity: 1. Register for a Jaggaer account: https://dft.app.jaggaer.com/web/login.html 2. Once you have a Jaggaer account, click through to: tender_6854 - IMO Lighting & BMS 2025 (Rear Wings) itt_2471 - IMO Lighting & BMS 2025 (Rear Wings) 3. Book a site visit at the IMO, 4 Albert Embankment, SE1 7SR by emailing [email protected] cc [email protected] - please indicate dates and two hour slots in which you will be available to attend. 4. With the exception of arranging site visits, please use the messaging function on the Jaggaer Portal for all other queries. Please note that the Portal sends automated notifications to alert suppliers of new messages. These will come from [email protected] and may appear in your Junk folder.

Open

IMO Lighting & BMS 2025 (Rear Wings)

The IMO Lighting & BMS Works 2025 (Rear Wings) includes: 1. Replacement of the existing lighting control system and light fittings with LED, including associated final design coordination, across the rear wings of the Ground, First, Second, and Fourth floors. 2. Replacement of existing fan coil unit controllers on the fourth floor including all the necessary ancillaries, the work includes: - Undertake full detail design of all necessary modifications to existing control systems - Supply and install new outstation controllers within riser control enclosures - Supply and install new fan coil unit controllers and associated sensors - Modify BMS head end to fully incorporate new controllers We are looking for a Principal Contractor to deliver the full work package. It is vital that validations for the lighting upgrades areas are undertaken promptly after contract award due to material lead-times. Delays in this process may impact the project schedules. The Department has been undertaking a phased upgrade programme for the replacement of obsolete FCU controllers. To date, the programme is approximately 50% complete and all upgrades have been undertaken Knight Controls Limited, who are also the incumbent maintenance contractor. Tenders from alternative controls specialists will be accepted, however the contractor should provide relevant case studies demonstrating similar projects and experience with Siemens BMS Installations. This will require approval from the Project Manager prior to appointment The provisional timetable for this procurement is: 13 Jan 25 - Tender goes live w/c 27 Jan 25 - Site Visits Noon on Monday 10 Feb 25 - Tender deadline w/c 10 Mar 25 - DfT Issue of intention to award w/c 24 Mar - Contract Award April - Validations on site by appointed contractor July - August 25 - Works on site, London If you are interested in this opportunity: 1. Register for a Jaggaer account: https://dft.app.jaggaer.com/web/login.html 2. Once you have a Jaggaer account, click through to: tender_6854 - IMO Lighting & BMS 2025 (Rear Wings) itt_2471 - IMO Lighting & BMS 2025 (Rear Wings) 3. Book a site visit at the IMO, 4 Albert Embankment, SE1 7SR by emailing [email protected] cc [email protected] - please indicate dates and two hour slots in which you will be available to attend. 4. With the exception of arranging site visits, please use the messaging function on the Jaggaer Portal for all other queries. Please note that the Portal sends automated notifications to alert suppliers of new messages. These will come from [email protected] and may appear in your Junk folder.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete