HardFM Minor Works Framework

Complete

Value

£0

Classifications

  • Construction work
  • Drainage system
  • Ground-drainage work
  • Drainage construction works
  • Drainage and surface works
  • Drainage works
  • Erection of fencing
  • Fencing, railing and safety equipment installation work
  • Landscape gardening services
  • Landscaping work for sports grounds and recreational areas
  • Grounds maintenance services
  • Parking-lot-surface painting work
  • Concrete repair work
  • Bricklaying work
  • Masonry and bricklaying work
  • Facing brickwork
  • Joinery and carpentry installation work
  • Joinery work
  • Non-metal joinery installation work
  • Builders' joinery
  • Cladding
  • Cladding works
  • Metalworking
  • Painting work
  • Painting work of buildings
  • Painting and glazing work
  • Painting and protective-coating work of structures
  • Painting work of structures
  • Repainting work
  • Roof works and other special trade construction works
  • Roof-covering and roof-painting work
  • Roof-covering work
  • Roof-tiling work
  • Roof-slating work
  • Roof repair and maintenance work
  • Roof repair
  • Roof maintenance work
  • Structural steel erection work for structures
  • Structural steel erection work
  • Dressed stonework
  • Installation of doors and windows and related components
  • Installation of door and window frames
  • Installation of window frames
  • Installation of doors and windows
  • Installation of windows
  • Installation of suspended ceilings
  • Floor-screed works
  • Floor and wall covering work
  • Floor-tiling work
  • Floor-laying and covering, wall-covering and wall-papering work
  • Floor laying and covering work
  • Floor-laying work
  • Laying work of flexible floor coverings
  • Floor-covering work
  • Lift and escalator installation work
  • Lift-maintenance services
  • Plastering work
  • Plasterboard works
  • Tiling work
  • Wall-tiling work
  • Mechanical installations
  • Mechanical engineering installation works
  • Repair and maintenance services of electrical and mechanical building installations
  • Repair and maintenance services of mechanical building installations
  • Installation services of electrical and mechanical equipment
  • Installation services of mechanical equipment
  • Heating works
  • Heating plant construction work
  • Heating-plant repair and maintenance work
  • Heating, ventilation and air-conditioning installation work
  • Central-heating installation work
  • Repair and maintenance services of central heating
  • Commissioning of heating installations
  • Electrical installation work
  • Electrical wiring and fitting work
  • Electrical wiring work
  • Electrical fitting work
  • Electrical installation work of heating and other electrical building-equipment
  • Electrical engineering installation works
  • Other electrical installation work
  • Electrical-system repair services
  • Repair and maintenance services of audio-visual and optical equipment
  • Repair and maintenance services of audio equipment
  • Fire-alarm system installation work
  • Fire-prevention installation works
  • Fireproofing work
  • Plumbing and sanitary works
  • Plumbing and drain-laying work
  • Water plumbing work
  • Urban furniture
  • Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products
  • Furniture
  • Office furniture
  • Computer furniture
  • Domestic furniture
  • Kitchen furniture and equipment
  • Miscellaneous furniture and equipment
  • Miscellaneous furniture
  • Modular furniture
  • School furniture
  • Blinds
  • Interior blinds
  • Exterior blinds
  • Installation work of roller blinds
  • Installation work of blinds
  • Catering supplies
  • Catering equipment
  • Repair and maintenance services of catering equipment
  • Installation of fitted kitchens
  • Works for complete or part construction and civil engineering work
  • Building construction work
  • Construction work for multi-dwelling buildings and individual houses
  • Construction work for houses
  • Sheltered housing construction work
  • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
  • Construction work of leisure facilities
  • Leisure centre construction work
  • Construction work for sports facilities
  • Construction work for swimming pool
  • Repair and maintenance services of electrical machinery, apparatus and associated equipment
  • Installation services of electrical equipment
  • Repair and maintenance services of clocks
  • Pest-control services
  • Tree-clearing services
  • Tree-cutting services

Tags

  • tender

Submission Deadline

4 months ago

Published

6 months ago

Description

This procurement is designed to establish a framework of suppliers across 10 trade categories and 6 geographic sub lots for the delivery of minor works projects across Aberdeenshire Council's estate.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penwith Gallery Studios 1-3, Reactivating the Creative Spaces

The Penwith Gallery is the home of the Penwith Society of Arts in Cornwall. The Gallery, formerly an old pilchard packing factory, has a remarkable complex of buildings, including three public galleries, artists' studios, a print workshop, a sculpture courtyard, shop and archive.The Society was founded in 1949 by Barbara Hepworth, Ben Nicholson, Peter Lanyon, Bernard Leach, Sven Berlin and Wilhelmina Barns-Graham, amongst others. This association with so many progressive and influential artists has given the Penwith Society a unique place in British art history. A charitable company - Penwith Galleries Ltd - was created to arrange the programme of exhibitions, execute all gallery business and manage the entire complex. Today the Penwith offers a year-round programme of exhibitions by Society Members and Associates, as well as those by other artists from Cornwall and further afield. The Penwith continues to be at the forefront of presenting contemporary work of quality. Our project will involve the reconfiguration and reactivation of space currently occupied by three of our eleven artists' studios above the main gallery. The studios are situated in what was formerly St Peter's Loft, Peter Lanyon's school of painting. Studios 1 and 2 are no longer fit for purpose and have been redundant for some time. They need reboarding with additional fireproof materials, and studio 1 is in need of proper fire exit access. The two studios share a site with Studio 3 which is the long-term home of the Porthmeor Printmakers Workshop. This space is still in use as a working and teaching space at present but requires significant works in order to continue to be a viable site in the future. Boards need replacing here too and proper toilet facilities need to be installed to replace the inadequate current amenities, and the layout itself is poorly arranged with a lot of dead space which could be repurposed to better effect. We intend to reconfigure the layout across all three current studios, moving Studio 1 to the other end of the Print Workshop, building a fire corridor, moving and improving the Printmakers Workshop office space and creating a fourth studio for a new artist tenant. We propose beginning the works in December 2024 during the gallery closure and completing the works by March 2025

Open

Appointment of Contract for the Base Build for Boathouse 6 Project

The National Museum of the Royal Navy (NMRN) has launched a search for a base build contractor to support the delivery of the works packages for the new Royal Marines Experience Museum (RMEM) offer to Portsmouth Historic Dockyard (PHD). The reimagination of Boathouse No.6 - a Grade II* listed building constructed in 1845 and one of the earliest examples of a building with load-bearing iron -frames - will bring ground-breaking new visitor experiences to the site. The vision of the whole project is to re-imagine the magnificent 1840s-built, Grade II* listed Boathouse 6, as a centre for activities for all ages, where heritage is valued, accessible and relevant. It will become home to the Royal Marines Experience Museum, a special exhibition gallery, a family-focused marines-themed laser quest, and a dual-use public programme and conference facility. The base build contractor will be procured during the RIBA Stage 3 coordinated design stage using a two-stage tender process. The procurement will be via a Restricted Tender process and will include Contractor Design Portions. A two-stage tender process allows the contractor to be involved in the project during the detailed design stage (RIBA Stage 4). This appointment is being undertaken under a Restricted Tender Procedure therefore, there is a two-stage process for this tender. There is an initial pre-qualifying phase whereby the NMRN wishes to evaluate potential bidders for suitability for this tender. This will be done by understanding a suppliers technical and professional ability and being suitably qualified for these works. This is pursuant to the PCR2015 Regulation Section 26 (7). As part of the tender process, the NMRN is offering interested parties the chance to participate in a Market Engagement Day on Thursday 5th December 2024 (1000-1230) hosted in Boathouse No.6. For details on this and how to book onto the day please see the tender documentation. All communication is to be done via [email protected] unless stated otherwise.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete