Supply, Installation and Commissioning of a new Fire Alarm System ( replacements) across 3 campuses - AWARD

Award

Value

£176,926

Classifications

  • Fire-alarm system installation work

Tags

  • award

Submission Deadline

1 year ago

Published

11 months ago

Description

For the Supply, Installation & Commissioning of new Fire Alarm Systems (replacements) within Buildings on the University of Cumbria Campuses of Ambleside, Lancaster & Fusehill Street in Carlisle.
      The University of Cumbria is looking to procure the services of a Company who can allocate a suitably qualified, experienced/registered Fire Alarm installation contractor, who can demonstrate their considered competence through training, experience, certifications & accreditations, recognised memberships and registrations that they are perfectly placed to deliver on this Contract and be able to submit officially recognised documentation upon completion. The Contractor appointed must be able to demonstrate experience of working on similar projects especially relevant would be those who can demonstrate recent experience of working with University/HE establishments on related projects.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Plas Caerdeon Electrical re-wire works & fire alarm upgrade

The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people. The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be striped out and replaced with a fully addressable system. It is the contractor's responsibility to design and specify the new fire alarm system and mange the works alongside the electrical installation. In association with these works there is a requirement to fill and make good all holes, penetrations etc. left by the removal of the old equipment, and also to the new equipment and cables provided by the new installation, paying particular attention to the Fire Strategy of the building and providing fire stopping where required, by a third-party accredited fire stopping contractor. In full compliance with the buildings fire strategy. As these works require decoration & making good, the University have requested that the decoration of all affected areas is included within the programme of works. In association with providing the new electrical panel heaters, socket outlets and switches to the building the following electrical works will also be required to facilitate the new installation.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete