DA from the CCS Framework RM6116 for Municipal Buildings to Darlington 10GB Network Links

Award

Value

£49,944

Classifications

  • Installation services (except software)

Tags

  • award

Submission Deadline

11 months ago

Published

9 months ago

Description

Direct Award from the Crown Commercial Services Framework RM6116 for Municipal Buildings to Darlington 10GB  Network Links

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open
Open

Local Electric Vehicle Infrastructure On Street Electric Vehicle Charging Installations

RBWM has been awarded Local Electric Vehicle Infrastructure (LEVI) funding from the Department for Transport. The purpose of this funding is to support new concession contracts for on-street charging within RBWM. RBWM has decided to divide this funding into two equal amounts, each to support one of two new area-based concession contracts in the borough. These contracts will be awarded through a single procurement, each contract to be won by a different supplier. As concession contracts, the borough is looking to partner with chargepoint operators that will bring in significant private investment of their own throughout the life of the contract to provide charging solutions for residents across their concession area. Private investment should very substantially exceed the value of the grant funding. The Chargepoint Operator will be responsible for securing overall funding and financing for their capital investment and will need to provide suitable assurance within their bid of suitable funding and financing arrangements for the chargepoint sites that they commit to deliver. The purpose of the grant funding is to accelerate wider private investment in an on-street charging network - ensuring chargepoints are in place ahead of time ready to meet and further induce growing demand. The LEVI capital funding will contribute towards the cost of: Chargepoint hardware Chargepoint installation Upgraded or new grid connections, including the local connection from feeder pillar to charging assets Works to the highway to reconfigure existing or create new parking spaces and/or parking restrictions, including but not limited to signs and lining Introducing or amending Traffic Regulation Orders or parking restrictions Licenses, approvals, permits, and local authority planning fees relating to installation (where needed)

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement

[email protected]

+44 1642528471

Timeline complete

Publish
Bid
Evaluate
Award
Complete