Provision of Service Quality Regime (SQR) and Related Services

Complete

Value

£2,850,000

Classifications

  • Auditing services
  • Database systems
  • Database software package
  • Building-inspection services
  • Technical inspection services

Tags

  • tender

Submission Deadline

1 year ago

Published

1 year ago

Description

London North Eastern Railway Limited (LNER) and Northern Trains Limited (NTL) have a requirement to deliver a Service Quality Regime (SQR) in support of their obligations to the Department of Transport (DfT). In order to deliver the above we are looking for a supplier or suppliers to provide independent inspections and mystery shopping across our networks with the requirement split into four lots to obtain the best solution. Bidders are free to bid for any combination of the following four lots: - 1.Service Quality Management System 2.Service Quality Register 3.Service Quality App/inspections software 4.Service Quality Inspections There will also be a requirement to deliver reporting and insights in order to ensure full compliance with the SQR. During the life of any agreement there may also be an opportunity for TransPennine Trains Limited (TPT) to join the arrangement with further details provided in the tender documents.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

2025-061 Technical Auditing for Engineering

Auditors to be employed to carry out Engineering asset assurance surveys and inspections at gas and electricity sites. The scope of work, for a period would be typically as follows for electricity assets: * Primary assets (transformers, circuit breakers > 25 years old) at ~ 20 substations supplying strategically important demand (possibly generation), including those designated Critical National Infrastructure (CNI). Estimated Time – 3 months assumed reasonable. Sites to be agreed with National Grid Electricity Transmission (NGET). DESNZ want input to this too. The auditor would provide their expert view on whether NGET’s asset management policies and procedures are fit for purpose and consistent with international best practice. Whether they are following these policies and procedures correctly, in terms of the monitoring, maintenance and repair/replacement of these assets. Whether they are accurately recording these activities and making appropriate/timely interventions where issues are identified. And whether they are reporting accurately to Ofgem through Network Asset Resilience Measures (NARMs). 2. Expanding 1 to cover 30 substations (>10% of all NGET substations as a representative sample), 4-5 months. 3. Expanding 1 to cover a wider set of substation assets (Protection & Control, Connections / Busbars, Civil Structures, Cables, Auxiliary Systems, disconnectors/earth switches etc), ~ 6 months. 4. Expanding 3 to cover 30 substations, say 9 months. 5. Expanding 3 to include 10% of Overhead Lines and Cables (~800km) on heavily loaded strategic transmission boundaries. 1-2 years at a guess. A similar programme would likely be developed for Gas.

Katy Reed

Published 1 day ago
Open

National Underground Asset Register (NUAR) Data Transformation and Ingestion Service

Ordnance Survey Ltd (OS) is Great Britain’s mapping agency and is responsible for the surveying, production, maintenance and marketing of a wide range of geographic information, relied on by government, business and individuals. Further information can be found on our website http://www.os.uk. OS is a private limited company (company registration number 09121572), and the entire share capital is owned by the Department for Science, Innovation and Technology. The purpose of this procurement is to appoint an organisation “the Supplier” to deliver the Data Transformation and Ingestion (DT&I) Service component of the National Underground Asset Register (NUAR) Data Lifecycle. The NUAR Programme is a Government Digital Service (GDS) initiative to build a digital map of underground pipes and cables that will revolutionise the way the different sectors of the economy install, maintain, operate, and repair Great Britain’s buried infrastructure. Once operational, NUAR is envisaged to deliver £490 million per year of economic growth through increased efficiency, reduced asset strikes (when underground pipes and cables are accidentally damaged) and reduced disruptions for the public and businesses. The NUAR Programme delivers underground asset data to thousands of utility users through the Safe-Dig User Interface. This improves the efficiency and safety of underground works by providing secure access to privately and publicly owned location data about the pipes and cables beneath our feet. The digital map, available through the Safe-Dig Interface, gives planners and excavators standardised access to the data they need, when they need it, to carry out their work effectively and safely. It also includes features to keep data secure and improve its quality over time. Data processed, stored and published under NUAR represents assets critical to the functioning of the nation and therefore security is critical to the delivery of the NUAR Programme. The programme takes a security first approach to every aspect of delivery. This is particularly important for organisation handling the data as the successful DT&I Supplier will be responsible for providing an access point through the Data Supply Portal for the Asset Owner (AO) and then transforming the data to the NHDM. The NPSA and NPSC are key partners and NUAR has been identified by the former as an exemplar of how to implement security into a major programme of national significance. The DT&I Service is the interface for all Asset Owner (AO) data entering NUAR. The service receives AO data, transforms it into the NHDM and makes it available for ingestion into the NUAR Holding DB. The Authority will then pull the data to the NUAR Holding DB. This procurement is to appoint a Supplier to deliver the Data Transformation and Ingestion (DT&I) Services which forms part of the NUAR Data Lifecycle. The Supplier will be required to transition all AOs (with a scheduled refresh date before 30 June 2026) by 1 April 2026. The Supplier will develop a plan, in consultation with the Authority, for transitioning the remaining AOs prior to their next scheduled refresh date. The Supplier will be provided with a DIS and a Transformation Pack for each AO to enable the transition. The services carried out by the Supplier must be delivered from within the UK. This includes any transfer or access of data and systems. It is anticipated that this contract shall commence on 8 December 2025 (the Commencement Date) which shall be the commencement of the Service Implementation and which shall complete on 31 March 2026. Following the Service Implementation, the remaining Services shall commence on 1 April 2026 and without prejudice to the early termination rights set out in the Conditions, shall continue for an initial period of two (2) years (the Term) The initial term of the contract will be for two years with the option for the Authority to extend the contract annually for a further three years meaning the contract would run until at least 31 March 2028, but potentially up to 31 March 2031 if all extensions were taken. Therefore, if all extensions are taken, the total length of the contract will be for five years (2+1+1+1).

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete