2321 A16/B1180 Pinchbeck Roundabout
Buyers
Value
£3,935,981
Suppliers
Classifications
- Construction work
Tags
- award
Submission Deadline
8 months ago
Published
7 months ago
Description
Currently the roundabout is 45m in diameter. The proposed works are to increase the size of the roundabout to 58m in diameter. This will involve the roundabout moving northwards into the adjacent field. The field is approximately 3-4m lower than the existing carriageway and the levels need to be built up. Compared to the size of the scheme a large proportion of earthworks is required. On top of earthworks there will be, resurfacing, bridge joints, kerbing, drainage, street lighting, signs and lining