YNE-CDF-Castle Mills Eel Pass-OBC Design
Buyers
Value
£52,240
Suppliers
Classifications
- River regulation and flood control works
Tags
- award
Submission Deadline
8 months ago
Published
7 months ago
Description
The Castle Mills Sluice is located on the River Foss, in the Foss Basin in York city centre. Optioneering took place earlier in 2023, to narrow down a preferred option to replace the original (no longer in-situ) eel pass. A preferred option has been selected as an outcome of this process and detailed design is required to enable its construction in summer 2024.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline complete
Complete