Framework Agreement for the Supply of Tarmacadam & Aggregates

Unknown

Value

£0

Classifications

  • Macadam, tarmac and tar sands

Tags

  • tenderUpdate

Published

8 months ago

Description

The Swansea Council undertake maintenance and construction works.
To facilitate these works it is necessary to procure materials and this tender is to facilitate the procurement of surfacing materials and dry stone products.  Goods must be delivered at the address shown on the purchase order, free of charge and at the contractors own risk and in such quantities as specified on each order issued under the terms of the contract.
All delivery drivers will be required to wear long sleeved high visibility vests or clothing Safety helmets and safety footwear, or they will be turned away. Due to the complexity and variation of requirements, we will at all times reserve the right to make the commercial decision to collect goods from any of the contracted supplier’s dependant of the location of works in relation to the supplier’s premises. This may result in goods being collected from the supplier who has not offered the lowest rate.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Works to The Tye Footpath

Demolition Specification Excavate existing footpath & ground to a depth of 160mm; remove all redundant material from site and dispose. Contractor to agree site measurement with Council representative and document prior to submission. The Works Phase 1 Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 111 meter long to North end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. Phase 2 Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 119 meter long to South end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. Specification/Notes Include all site safety barriers for public, maintain public access throughout works. Ensure public Health & Safety during works. Install weed preventative and weight stabilising membrane to all new works; lay 100mm certified MOT type 1 crushed limestone or equivalent, machine roll. Adjust all manhole chambers, water/gas stop tap boxes etc in height to new finished surfaced pathway Lay to total area 40mm 0f 20mm binder course tarmacadam and 20mm 0f 6mm surface course tarmacadam and machine roll. Tar any joints with hot poured bitumen to seal where new surface meets surrounding surface. Clear away and make good on completion Note: Please provide a price for each Phase as a separate works package including all associated set up costs. In the event that both Phase 1 & 2 are carried out concurrently please provide your discount for the combined works on the collection sheet

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline unknown