Network Rail North West & Central Region CP7 Frameworks: Framework Category C

Award

Value

£0

Classifications

  • Construction work
  • Site preparation work
  • Works for complete or part construction and civil engineering work
  • Railway bridge construction work
  • Railway viaduct construction work
  • Railway tunnel construction work
  • Railway construction works
  • Railway embankment construction work
  • Engineering design services for the construction of civil engineering works
  • Building construction work
  • Construction work for buildings relating to railway transport
  • Railway station construction work
  • Building installation work
  • Construction work for railways and cable transport systems
  • High voltage installation work
  • Low-voltage installation work
  • Railway engineering services

Tags

  • award
  • contract

Published

6 months ago

Description

Network Rail has put in place a number of frameworks for Control Period 7 (CP7) for the delivery of capital works in the North West & Central Region.  These frameworks are divided into categories and separate Contract Award Notices relate to each of them.  This Contract Award Notice relates to Framework Category C.
CP7 covers the 5 year period from 1st April 2024 to 31st March 2029.
The North West & Central Region (Region and referred to as R in the lots and sub-lots) is formed of 3 routes, North West (NW), Central (C) and West Coast South (WCS).  Some lots within this Contract Award Notice relate to the Region and others relate to one or more routes. 
Additional information on the Region (including the geographical areas covered by these 3 routes) can be found at: https://www.networkrail.co.uk/running-the-railway/ourregions/
north-west-and-central/
Framework Category C
This category relates to the implementation of “small projects” (projects with a value of between £100k and £4m), with discipline specific lots for Civil Engineering, Buildings and Electrification & Plant, across different geographical areas within the Region as described in section II.2 in more detail.
The scope of works proposed to be delivered under Framework Category C is:
• Implementation (including temporary works design and demolition)
•	Commissioning
• Hand back into maintenance
• Statutory consents and permissions
• If directed by Network Rail, third party access agreements
These works to Network Rail’s assets may incorporate partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening).
Network Rail has appointed suppliers to this Framework Category C across three discipline lots and geographical sub-lots as follows:
Civil Engineering (Structures & Geotechnical)
Lot C1 (R) Civil Engineering (Structures & Geotechnical) across the full Region: 1 Supplier
Lot C1 (NW) Civil Engineering (Structures & Geotechnical) in North West Route area only: 2 Suppliers
Lot C1 (C) Civil Engineering (Structures & Geotechnical) in the Central Route area only: 1 Supplier
Lot C1 (WCS) Civil Engineering (Structures & Geotechnical) in the West Coast South Route area only: 1 Supplier
Buildings
Lot C2 (NW) Buildings in North West Route area only: 1 Supplier
Lot C2 (C&WCS) Buildings in combined Central Route and West Coast South Route areas only: 1 Supplier
Electrification & Plant
Lot C3 (C&WCS) Power & Distribution in the combined Central Route and West Coast South Route areas only: 1 Supplier

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete