Civil Engineering Small Works

Complete

Buyers

Value

£5,800,000

Classifications

  • Works for complete or part construction and civil engineering work
  • Bridge
  • Construction work for bridges and tunnels, shafts and subways
  • Construction work for bridges
  • Road bridge construction work
  • Footbridge construction work
  • Construction work for iron bridges
  • Construction work for steel bridges
  • Bridge renewal construction work
  • Safety fencing
  • Fencing, railing and safety equipment installation work
  • Erection of fencing
  • Topographical services
  • Bathymetric surveys services
  • Architectural, engineering and surveying services
  • Surveying services
  • Flood-defences maintenance works
  • Installation of traffic lights
  • Installation of traffic guidance equipment
  • Traffic lights
  • Traffic-signal maintenance services
  • Road paint
  • Road-surfacing materials
  • Construction, foundation and surface works for highways, roads
  • Construction work for highways, roads
  • Road construction works
  • Roadworks
  • Surface work for roads
  • Engineering works and construction works
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Road-repair works
  • Road-surface painting work
  • Flood-prevention works
  • Tree-clearing services
  • Tree-cutting services
  • Tree-maintenance services
  • Tree pruning and hedge trimming
  • Tree pruning

Tags

  • tender

Submission Deadline

1 year ago

Published

1 year ago

Description

Moray Council wishes to establish a Framework Agreement with suitably qualified and experienced Contractors to assist with delivery of the Council’s Capital and Revenue programmes, for civil engineering related work.
This agreement will replace the current Civil engineering Small Works Framework ref 18/0326, which is due to expire in June 2024.
The anticipated total value of this framework is in the region of 5,729,000 and is expected to run for an initial period of 2 years, with options to extend for a further period of 2x12 months.
This notice is to make potential suppliers aware of this future contract opportunity and proposed timescales.
The new Framework will be split into the following Lots:
1 - Surfacing and Roads
2 – Flood Risk Maintenance
3 – Vegetation Management
4 – Bridge and Structure Maintenance
5 – VRS
6 – Fencing
7 – Topographic and Bathymetric Surveys
8 – Ecology Surveys
9 – Pump Station Maintenance
10 – Traffic Management
11 – Road Lining and Ancillaries

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 12 hours ago
Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 12 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Elaine Summerfield

[email protected]

+44 1343563137

[email protected]

+44 343542505

Timeline complete