Dog Wood Cycle Path Design

Complete

Value

£0

Classifications

  • Footpath construction work

Tags

  • tenderAmendment

Submission Deadline

1 year ago

Published

1 year ago

Description

This project is funded by the UK government through the UK Shared Prosperity Fund (UKSPF). The appointed contractor/supplier will be expected to ensure adherence to all UKSPF guidance. 

PROJECT SCOPE

The scope of this work is to:

1- Develop a design for the proposed route

Following an on-site survey, develop a detailed design plan for the route for its full extent. This should include a map showing the precise route and widths. The path should be suitable for pedestrian and cycle use.

It will also identify the works required to build the path, including (for example) the construction of culverts, installation of fencing, removal of trees, grading of land etc. This should be sufficient to clearly explain to landowners what works would be required.

The plan should detail options/recommendations for the finish of the path and associated infrastructure (e.g. signage, drainage, lighting) as applicable.

The design should carefully consider the existing sites and safety of users i.e. in relation to proximity to the railway.

2 - Develop a proposed construction methodology 

This should detail how the plan in section one would be constructed including site access, construction methods and site compounds. It should be sufficiently detailed to be used as the basis for a formal tender for companies to price against and should identify all works anticipated to deliver the path. 

The railway bridge at Mallard Close is not suitable for vehicular use and Network Rail would not permit works vehicle access over this.

3 - Provide an indicative price estimate 

This should provide a guide cost for the project to enable us to seek grant funding. 

This should be:

a)	Single phase for whole path
b)	Two phases: Moor to Tatton Park and Through Tatton Park to Parkgate Lane

QUOTE SUBMISSIONS 

The deadline for submission of quotes is 31st January 2024.

All quotes should be submitted by email to: [email protected].

The submission should comprise:

1)	Quotation of a fixed price for the requirement set out
2)	An example of a similar report you have prepared 
3)	Company background and key personnel skills/experience 
4)	A reference for a similar project

Similar Contracts

Open

Highways Framework

Blackpool Council are establishing a lotted - Highways surfacing and civil engineering works Framework. The procurement will be conducted as an open tender and will establish a framework for a 4-year period. Call off contracts may be entered into from the framework in the manner described within the tender documents. The framework will consist of two lots as follows: Lot 1 – Highways Surfacing - Surfacing includes re-surfacing and re-construction of the highway network using conventional surfacing materials consisting of flexible and rigid pavement treatments (hot, warm and cold mix asphalts/concrete) Lot 2 – Highways Civils - Civil Engineering Works includes construction of improvement works on or associated with the highway network The intention is to establish a framework of up to 4 Suppliers for lot 1 and up to 4 Suppliers for lot 2. The indicative range of call off contracts that may be entered into is typically expected to be in the range as set out below: • Lot 1 – Highways Surfacing - £100,000 - £5,000,000 • Lot 2 – Highways Civils - £100,000 - £1,500,000 In addition to Blackpool Council the framework is being made available to Lancashire County Council, Blackburn with Darwen Council, Lancashire Combined County Authority, Current members, associate members and future members of the Association of Greater Manchester Authorities. The published tender documents set out full details of the procurement process. All tender documents are available free of charge through Blackpool Council's e-tendering portal - https://procontract.due-north.com/

Katy Reed

Published 1 week ago
Open

P1228 - Highways and Infrastructure Works Framework Agreement

Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement. These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects. The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. • Lot 1: works with an estimated value of up to £200,000. • Lot 2: works with an estimated value of between £200,001 and £1,000,000. • Lot 3: works with an estimated value of between £1,000,001 and £10,000,000. • Lot 4: works with an estimated value greater than £10,000,000. • Lot 5: contestable and non-contestable utility work related to capital infrastructure projects with no upper limit. The maximum number of tenderers awarded to each lot is as follows: • Lot 1: up to 10 • Lot 2: up to 6 • Lot 3: up to 3 • Lot 4: up to 2 • Lot 5: up to 3 Other local Public Bodies based within the East Midlands and West Midlands are entitled to use the Framework Agreement, subject to approval by the Council. This is affected by the completion of an access agreement between the Council and these other local Public Bodies. The open framework scheme will remain in place for a maximum period of up to eight years, commencing on the date that the Contract is awarded pursuant to this procurement process. Further details in respect of how the open framework scheme will operate are set out within the Framework Opening Protocol, contained in the tender documents. NEC4 terms and conditions will be used for this framework. Suppliers will need to ensure they are on the Central Digital Platform. Of the £980m framework spend (excl VAT), £640m of this is for Birmingham City Council

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Adam Keppel-Green

[email protected]

01565 653 929

Timeline complete