National Solar Framework

Award

Value

£2,000,000

Classifications

  • Solar installation

Tags

  • award
  • contract

Published

9 months ago

Description

You are invited to tender for the design and installation of solar photovoltaic panels and solar thermal panels with associated electrical, plumbing and monitoring system installation.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Fishermens Stores at Padstow Garland R-Mer-Clad HPS200 with new Solar panels and Batteries

Padstow is a small commercial port situated 1.5 miles from the sea, within the estuary of the River Camel. Traditionally a fishing port and currently home to a fleet of approximately 20 inshore fishing vessels, the harbour activity has adapted to cater for the busy tourist industry with a wide range of vessels offering an array of trips to suit all would be sea goers. Padstow Harbour Commissioners are the statutory Trust Port body, established by an Act of Parliament in 1844. The Harbour is governed by 9 elected Commissioners, 3 from each of the 3 parishes surrounding the estuary, Padstow, Rock and Wadebridge, and the Harbour Master who sits at the table as the Lord of the Manor representative, and collectively they manage both the leisure and commercial operations of the port. This project involves the installation of a number of solar panels to the roof of the fishermen stores at Padstow. To ensure the efficiency of the works and to safeguard any future repairs to an aged roof, it is proposed that the installation will include a new insulated roof which will cool the stores in the summer months whilst insulating them through the winter. The aim of the project will be to reduce the service charges to our fishermen who lease the stores on a long term basis, and to bring the port into the realms of greener operations. Rising costs of electricity add to the struggles of the inshore fishing fleet who already suffer from the management of the industry being overly complex and inconsistent in its approach as well as ineffective in delivering long term sustainability goals. Escalating costs can lead to a decrease in the safety of vessels through the inability to reinvest in maintenance and equipment. If we are able to reduce the service charges for the fishermen we hope to see any savings reinvested into their business, leading to future proofing, sustainability, increased efficiency and productivity and the overall longevity of the inshore fishing at the Port of Padstow. We have approached three companies for the installation of solar panels with one of the companies offering an overall package of roof and panel installation. It is proposed that the works will be carried out by the chosen contractor who will arrange for all the necessary means for installation. This will also ensure that the products fitted to the stores will be delivered with a suitable warranty, limiting the possibilities of additional costs in the future. We will assess tenders received on a Most Economically Advantageous Tender.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete