Civil Engineering Small Works

Planned

Buyers

Value

£580,000

Classifications

  • Works for complete or part construction and civil engineering work
  • Engineering works and construction works

Tags

  • planning

Published

7 months ago

Description

Moray Council wishes to establish a Framework Agreement with suitably qualified and experienced Contractors to assist with delivery of the Council’s Capital and Revenue programmes, for civil engineering related work.
This agreement will replace the current Civil engineering Small Works Framework ref 18/0326, which is due to expire in June 2024.
The anticipated total value of this framework is in the region of 5,729,000 and is expected to run for an initial period of 2 years, with options to extend for a further period of 2x12 months.
This notice is to make potential suppliers aware of this future contract opportunity and proposed timescales.
The new Framework will be split into the following Lots:
1 - Surfacing and Roads
2 – Flood Risk Maintenance
3 – Vegetation Management
4 – Bridge and Structure Maintenance
5 – VRS
6 – Fencing
7 – Topographic and Bathymetric Surveys
8 – Ecology Surveys
9 – Pump Station Maintenance
10 – Traffic Management
11 – Road Lining and Ancillaries

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Civil Engineering Works

The Commission requires the following construction activities to be delivered under this DPS: - Construction of granular forest roads - Construction of granular pedestrian and shared use trails - Construction of forestry harvesting infrastructure such as tracks, ramps and stacking bays. - Significant upgrades to existing granular forest roads including grading and rolling - Construction of bound roads and trails - Car parks and extensions to existing facilities - Construction of forestry road bridges - Pedestrian bridges (typically 10m length) - Reservoir works, such as spillway upgrades, significant repairs, etc. - Culverts - Retaining walls (typically 2m retained height and 10m long) - Supply and installation of new and replacement utility services such as foul drainage systems, surface water drainage and water supply pipes and equipment. - Supply and installation of trenching to accommodate utility services such as drainage systems, water supply and electric and data communication equipment, which could be either direct lay or installed within ducting. - Construction of Sustainable Drainage Systems (SuDS) to manage rainwater runoff. - Other civil engineering construction projects - Maintenance works where these form part of a larger construction project - Supply and or haulage of aggregates where these form part of a larger construction project - Excavation and removal/disposal of deteriorated or unsuitable materials where these form part of a larger construction project We require suppliers to have capability in the following areas: - Excavation and compaction of road and trail formation to appropriate line and level - Drainage installation and maintenance - Soft ground working - Steep ground working - Procuring, laying and compaction of granular materials - Procuring, laying and compaction of bituminous materials - Kerbing - Retaining wall construction - Structural steelwork associated with simple bridge construction - Reinforced and unreinforced concrete - General carpentry work - Install of utility services such as drainage, pipes and cables. - Landscaping The list of work which is required is descriptive only and the Commission may require and instruct works which are analogous to those listed. Typical contract values are between £50,000 to £250,000, but there are no financial limits imposed.

Open

Civil Engineering Works

The Commission requires the following construction activities to be delivered under this DPS: - Construction of granular forest roads - Construction of granular pedestrian and shared use trails - Construction of forestry harvesting infrastructure such as tracks, ramps and stacking bays. - Significant upgrades to existing granular forest roads including grading and rolling - Construction of bound roads and trails - Car parks and extensions to existing facilities - Construction of forestry road bridges - Pedestrian bridges (typically 10m length) - Reservoir works, such as spillway upgrades, significant repairs, etc. - Culverts - Retaining walls (typically 2m retained height and 10m long) - Supply and installation of new and replacement utility services such as foul drainage systems, surface water drainage and water supply pipes and equipment. - Supply and installation of trenching to accommodate utility services such as drainage systems, water supply and electric and data communication equipment, which could be either direct lay or installed within ducting. - Construction of Sustainable Drainage Systems (SuDS) to manage rainwater runoff. - Other civil engineering construction projects - Maintenance works where these form part of a larger construction project - Supply and or haulage of aggregates where these form part of a larger construction project - Excavation and removal/disposal of deteriorated or unsuitable materials where these form part of a larger construction project We require suppliers to have capability in the following areas: - Excavation and compaction of road and trail formation to appropriate line and level - Drainage installation and maintenance - Soft ground working - Steep ground working - Procuring, laying and compaction of granular materials - Procuring, laying and compaction of bituminous materials - Kerbing - Retaining wall construction - Structural steelwork associated with simple bridge construction - Reinforced and unreinforced concrete - General carpentry work - Install of utility services such as drainage, pipes and cables. - Landscaping The list of work which is required is descriptive only and the Commission may require and instruct works which are analogous to those listed. Typical contract values are between £50,000 to £250,000, but there are no financial limits imposed.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Elaine Summerfield

[email protected]

+44 1343563137

Timeline planned