Cell Cycling Building MEP

Award

Value

£200,000

Suppliers

Classifications

  • Building installation work

Tags

  • award

Submission Deadline

11 months ago

Published

8 months ago

Description

UKBIC is a facility that enables research and development of electric vehicle batteries. The building has been in use for circa 2 years. Further growth in the sector has provided additional funding to enable further projects to be installed within the facility. These projects are developed to generally use the initially installed "spare" capacity designed within the initial fit out. However, designers must undertake a detailed review within every project to ensure the existing infrastructure is suitable for the additional loads. Some of the proposed principles have been verbally discussed with minimal drawings produced and approved prior to this document issue. Therefore, this document has been produced to summarise all proposed works associated with the Cell Cycler projects, in relation to Mechanical and Electrical services.\r
\r
All the Mechanical and Electrical Services are being tendered on a performance basis for this project. The Contractor shall be responsible for the full adoption of the design concepts and principles provided, detailed design, installation, and commissioning of all necessary building services to suit the building layouts and passive fabric principles. The Performance Specification details the design standards that shall be adhered to in the development of the design of the building services, including all passive measures set out by the Client's team for the project. The performance specification should not be taken as being exhaustive, but it is indicative of the quality and standards required for the project. Note that the drawings issued with the tender are to illustrate the design concepts and principles to be fully adopted and developed into a fully detailed design at the start of the contract period prior to any services being installed on site.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

GB-Benfleet: EPP0121 Solar Panels for Waterside Farm Leisure Centre

NOTE: This notice was updated on 18 September 2024 for the following reason: Added link to Tenderbox: To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/9M84T8V6XB If you experience any technical difficulties from accessing the above url, then please contact the Delta eSourcing Helpdesk on call 0800 923 9236 or email [email protected].(Castle Point Borough Council is seeking tenders from suitable and qualified contractors for the installation of solar photovoltaics system and associated work over the metal sheet roof [of the swimming pool] at the Waterside Farm Leisure Centre. The swimming pool roof is part of the Waterside Farm Leisure Centre building and is located on the Western end of the building (the other roofs are not part of this Solar PV installation scheme). The Leisure Centre is part of the Waterside Farm Site, surrounded by service roads, sports fields, and parking areas. The swimming pool building is adjacent to the nearby St John Ambulance building, the A1 Motorbike training area to the south, and the Canvey Miniature Railway to the northwest. The B1014 Somnes Avenue and the A130 Canvey Road border the site boundaries. Know hazards associated with the works include (but are not limited); •Working at height [upon the roof/scaffold], risk of falls, •Working on a roof deck [above the swimming pool], •Dropping materials and tools from height. •Unauthorised access and the risk of vandalism •Vehicular access risk of collision, deliveries and access through the Waterside Farm LC site and carpark •Scaffold erection/removal and risk of collapse & risk of obstructing emergency routes from the Leisure Centre •The Scaffold design, by placing loads on the existing building •Risk of damage to the existing external M&E Plant and equipment to the western side elevation located on the adjacent flat roof.)

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete