UKRI-2960 Building R69 Design and Build
Value
£468,871
Suppliers
Classifications
- Building construction work
Tags
- award
- contract
Published
10 months ago
Description
This document sets out the Client (UKRI) Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. The new building will aim to provide ample space for the new instruments, better staff facilities and allow for future adaptability should new instruments or experiments need to be accommodated. The new building is proposed to be a 2-storey building built on the existing footprint. The proposed building contains a main Instrument Hall and supporting facilities such as Control Room, Meeting Room and Laboratory. The project is currently at RIBA Stage 3. https://www.ukri.org/who-we-are/procurement-contract-transparency-data/
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Organisation
+44 1793442000
+44 1235446553
Timeline complete
Complete