UKRI-2960 Building R69 Design and Build

Award

Value

£468,871

Classifications

  • Building construction work

Tags

  • award

Submission Deadline

11 months ago

Published

10 months ago

Description

This document sets out the Client (UKRI) Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. The new building will aim to provide ample space for the new instruments, better staff facilities and allow for future adaptability should new instruments or experiments need to be accommodated. The new building is proposed to be a 2-storey building built on the existing footprint. The proposed building contains a main Instrument Hall and supporting facilities such as Control Room, Meeting Room and Laboratory. The project is currently at RIBA Stage 3.
      https://www.ukri.org/who-we-are/procurement-contract-transparency-data/

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete