Appointment of Integrated Consultancy Team (ICT) for the Connecting Pomeroy Capital Project

Award

Value

£269,394

Suppliers

Classifications

  • Construction project management services
  • Architectural design services

Tags

  • award
  • contract

Published

11 months ago

Description

The commission is for the appointment of an Architect led Integrated Consultancy team (ICT) to prepare, develop and project manage the delivery of the Connecting Pomeroy schemes including all aspects of the RIBA 2013 plan of work from Stages 0-7, working alongside with Mid Ulster District Council (MUDC) staff to prepare all design and legislative requirements and project management for the delivery of the Council Peace IV Connecting Pomeroy shared space projects.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Project Management re. Brooksby Building BACS additional works

The contract is for a single supplier to provide Project Management in relation to the Project Management Brooksby Building BACS additional works Project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. The Brooksby Building at The Pirbright Institute (Pirbright) will be a high containment large animal facility for work on high consequence pathogens such as foot-and-mouth diseases virus (FMDV), when fully operational in 2026. As part of the post-construction 'Day 2' works there is a requirement to carry out additional works to the Building Automation and Control System (BACS) within the Brooksby Building to ensure it is fully aligned with the primary system used across the rest of the Pirbright site. The following packages of work have been funded and will be procured by Pirbright, with technical support from the Project Manager, and will require on-site project management to ensure all interdependencies, risks and issues are managed appropriately for the duration of the project: • Recategorisation of BACS alarms to align with Pirbright site standard and integration to Pirbright Alarm Management System (AMS) of all BACS alarms within Brooksby (Work Package 1) • Provision, installation, testing and commissioning of an additional 140 no. (approx.) BACS Input/Output Alarm Points (Work Package 2) The Scope of Services for this contract is as follows: - Full Project Management to include: - Management of programme for packages of work listed above - Management of sub-contractors, these will be appointed directly by The Pirbright Institute - Management of interdependencies - Principal point of contact for the project, liaising with internal and external stakeholders as required - Reporting: Production of Project Highlight Report on a monthly basis, on Pirbright template document - Responsible for ensuring project benefits are realised - Management of project budget - Responsible for monthly cashflow forecast reporting - Proactive management of project risks and issues, owner of Project Risk Register and Issues Register - Regular site attendance to ensure project is progressing as per programme - Quality Assurance - Site attendance at monthly Project Board meetings - Handover of all documentation in line with Pirbright Project Information File (PIF) structure. A Sample PIF is attached in Appendix E1B.

Open

Architect-Led Design Team - Accrington Market Chambers

Hyndburn Borough Council (HBC) is currently in the Development Phase of a round 1 application to the National Lottery Heritage Fund which will focus on the redevelopment the listed Accrington Market Chambers (AMC) to create a new Heritage Museum, with the community, for the community. HBC wishes to appoint a suitably qualified and highly experienced Architect-Led Design Team (ALDT) to work with the Exhibition Design Specialist, Project Manager and Cost Consultant on the Pre-development, Development, and Delivery Phases - RIBA 2 to RIBA 6. This shall be in accordance with the RIBA Plan of Work 2020. RIBA Stage 1 design has been completed. The firm(s) appointed to this ALDT role will be managed by HBC as PM. There will be a Lead Consultant in the ALDT who will be a primary point of contact between the ALDT and the PM. The deliverables for the project are: • Early appointment of the CDM Principal Designer, Building Regs Principal Designer, and Client CDM Advisor, to manage all Health and Safety matters, including discharge of all CDM duties (as Principal Designer) and all other Health and Safety duties under other legislation and best practice, liaison with the PM and Client on CDM and H&S matters during development, construction, and handover. • All surveys necessary to establish full scope of works. Costs of surveys will be allocated to a separate budget pot. • Planning permission (including general and specialist planning advice) and other Statutory Consents. • A 3D model of the building (requirement TBC) for use in the design, cost management and build process. • Detailed designs up to and including RIBA Stage 5 (Construction) for all design activities and disciplines, including on responses to Contractor design queries, materials approvals, and provision of information for effective contract administration. • Contribution to fully itemised Cost Plans for the Capital Works and production of relevant procurement documents. • Contribution to National Lottery Heritage Fund Delivery (Round 2) grant applications; experience of a National Lottery Heritage Fund capital project is required. • Assistance in procurement of Principal Contractor and delivery of Capital Works project. • A Management & Maintenance Plan Evaluation of the project on completion. Contribute to relevant post-completion activities, such as production of operation and maintenance manuals, lessons learnt exercises, community events, and so on. • Technical Advisor / Clerk of works / NEC Supervisor during RIBA 5 (dependent on main works contract chosen. Contract type TBC). Subject to satisfactory performance and funding being secured for the Delivery Phase, members of the ALDT may also be commissioned, through this same tender process, to work with the Project Manager and Cost Consultant to deliver the implementation of all building works, including service installations from initial concepts through to completion and handover. Application instructions included in the attachments.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

tendersmidulstercouncil.org

[email protected]

+44 3000132132

[email protected]

+44 2890402000

[email protected]

+44 3000132132

Timeline complete

Publish
Bid
Evaluate
Award
Complete