Upgrade to existing Natural Gas Roller Hearth Tile Kiln to fire on 100% Hydrogen

Award

Value

£258,000

Suppliers

Classifications

  • Industrial or laboratory furnaces, incinerators and ovens

Tags

  • award
  • contract

Published

1 year ago

Description

The design, supply, and installation of modifications to our existing   Natural Gas Roller Hearth Tile Kiln. Our organisation intends to transition the kiln to operate on 100% hydrogen, whist retaining the existing natural gas combustion system and ensuring its safe and efficient operation. The kiln therefore requires the parallel installation of 100% hydrogen rated burners.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Award

Kiln Replacement - VTN

Issuing a VTN to enable a 10 day stand still period for the award of the kiln replacement to Sibor Ltd. The Defence Science & Technology Laboratory (DSTL), part of the UK Ministry of Defence (MoD) intends to award a contract with a total estimated value of £450,640.9 (including VAT) to SiBOR Ltd for the supply, installation and commissioning of a Ciroldi RP8 rotary kiln. In accordance with the provisions of The Public Procurement (Amendment etc.) (EU Exit) Regulations 2020 SI No. 2020/1319, this procurement falls to be regulated under the provisions of the Public Contracts Regulations 2015 as amended (in particular by SI 2020/1319). Prior publication of a contract notice in the Official Journal of the European Union is no longer appropriate. It is considered that the award of this contract without Prior Publication of a Contract Notice in the UK enotification service (in accordance with the relevant legislation) is lawful in accordance with Regulation 32(2)(b)(ii) of the Public Contracts Regulations 2015 for technical reasons. The incinerator facility activities are governed by a permit issued by the Environment Agency (EA). The rotary kiln is one of the main burners for the Incinerator, manufactured by Ciroldi SPA. SiBOR Limited the only company authorised by Ciroldi SPA in the UK for the installation, support and maintenance of the rotary kiln. Use of alternative kilns or methods of incineration is not feasible, as it would require extensive modification to the current incinerator facility. As a new Incinerator facility is being planned, such modification is unacceptable. Furthermore, any changes to the way waste is incinerated at the facility would require a change to the EA permit, necessitating extended down-time whilst being assessed.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

James Till

[email protected]

+44 1785331900

Timeline complete

Publish
Bid
Evaluate
Award
Complete