Framework - Adaptations, Improvements, Maintenance and Environmental (AIME)

Award

Value

£21,080,000

Classifications

  • Construction work
  • Woodwork
  • Carpentry installation work
  • Builders' carpentry
  • Joinery and carpentry installation work
  • Drainage construction works
  • Drainage works
  • Drainage and surface works
  • Painting work
  • Repainting work
  • Painting work of buildings
  • Floor coverings
  • Floor-laying work
  • Laying work of flexible floor coverings
  • Floor laying and covering work
  • Floor-tiling work
  • Erection of fencing
  • Asphalt
  • Paving and asphalting works
  • Repair and maintenance services
  • Waterproofing work
  • Construction materials and associated items
  • Repair and maintenance services of building installations
  • Construction structures and materials; auxiliary products to construction (except electric apparatus)
  • Miscellaneous repair and maintenance services
  • Building installation work
  • Disability benefits
  • Devices for the disabled
  • Insulation work
  • Radio, television, communication, telecommunication and related equipment
  • Cable TV
  • Television services
  • Boilers
  • Boiler installation work
  • Repair and maintenance services of boilers
  • Lift-maintenance services
  • Lifts
  • Lift installation work
  • Roof repair and maintenance work
  • Roof repair
  • Repair and maintenance services for pumps, valves, taps and metal containers and machinery
  • Repair and maintenance services of water meters
  • Plastering work
  • Scaffolding
  • Scaffolding structures
  • Scaffolding erection work
  • Scaffolding work
  • Doors
  • Installation of door and window frames
  • Installation of doors and windows
  • Installation of windows
  • Installation of window frames
  • Window frames
  • Installation of doors and windows and related components
  • Installation of doors
  • Windows

Tags

  • award
  • contract

Published

11 months ago

Description

Framework - Adaptations, Improvements, Maintenance and Environmental (AIME) Please note this is the same procurement as IBC/15287. The documents are the same, there are no changes to scope, specification and no other requirements. The only changes are to the timetable in the ITT.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete