National Framework for Mechanical and Electrical Solutions

Award

Value

£1,000,000,000

Classifications

  • Building installation work
  • Mechanical installations
  • Installation services of mechanical equipment
  • Repair and maintenance services of mechanical building installations
  • Mechanical engineering installation works
  • Electrical installation work
  • Repair and maintenance services of electrical machinery, apparatus and associated equipment
  • Installation services of electrical equipment
  • Other electrical installation work
  • Electrical wiring and fitting work
  • Electrical installation work of heating and other electrical building-equipment
  • Repair and maintenance services of electrical building installations
  • Installation services of electrical and mechanical equipment
  • Repair and maintenance services of electrical and mechanical building installations

Tags

  • award
  • contract

Published

2 years ago

Description

Added Value Portal t/a Pagabo, acting on behalf of Cumbria, Northumberland, Tyne and Wear NHS Foundation Trust, is looking to appoint a number of organisations to a Framework Agreement to provide a range of mechanical and electrical related works, from £50,000 across multiple geographical areas. The framework will cover, but is not limited to, new builds, refurbishment and maintenance requirements. The Framework Agreement will be established for a period of 4 years, with no option to extend. This Framework Agreement is being advertised and tendered, so it can be utilised by all public-sector bodies (including Charities) in the UK, the full list of applicable public sector organisations is available in the Tender synopsis on Pagabo's In- Tend portal - https://in-tendhost.co.uk/pagabo/aspx/ProjectManage/1265. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 12 hours ago
Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 12 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete