Planned Internal and External Refurbishment Works Programme

Complete

Buyers

Value

£340,000,000

Classifications

  • Refurbishment work
  • Installation of fitted kitchens
  • Bathrooms construction work
  • Repair and maintenance services of central heating
  • Electrical wiring and fitting work
  • Asbestos-removal work
  • Installation of doors and windows
  • Roof repair and maintenance work
  • Decoration work
  • Insulation work

Tags

  • tender

Submission Deadline

1 year ago

Published

1 year ago

Description

A programme of planned refurbishment works to various residential properties within Peabody's housing stock in the following lots:
Lot 1a - Internal Refurbishment Works North London
Lot 1b - Internal Refurbishment Works North East London and Essex
Lot 1c - Internal Refurbishment Works Inner London
Lot 1d - Internal Refurbishment Works South London
Lot 2a - External Refurbishment Works North London
Lot 2b - External Refurbishment Works North East London and Essex
Lot 2c - External Refurbishment Works Inner London
Lot 2d - External Refurbishment Works South London

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Plas Caerdeon Electrical re-wire works & fire alarm upgrade

The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people. The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be striped out and replaced with a fully addressable system. It is the contractor's responsibility to design and specify the new fire alarm system and mange the works alongside the electrical installation. In association with these works there is a requirement to fill and make good all holes, penetrations etc. left by the removal of the old equipment, and also to the new equipment and cables provided by the new installation, paying particular attention to the Fire Strategy of the building and providing fire stopping where required, by a third-party accredited fire stopping contractor. In full compliance with the buildings fire strategy. As these works require decoration & making good, the University have requested that the decoration of all affected areas is included within the programme of works. In association with providing the new electrical panel heaters, socket outlets and switches to the building the following electrical works will also be required to facilitate the new installation.

Katy Reed

Published 23 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Sarah Carpenter

[email protected]

+44 7901956223

Timeline complete