EN:Procure - Framework for Installation, Servicing, Maintenance and Repair Works (GEN4)

Unknown

Value

£0

Classifications

  • Construction work

Tags

  • tenderUpdate

Published

2 years ago

Description

EN:Procure Ltd. (ENP) is a social housing regeneration consortium based in North of England. ENP specialises in the procurement of goods, works and services for the construction and maintenance of social housing properties.
ENP wishes to procure and enter into a Framework Agreement with multiple contractors for the completion of a range of installation, repair and/or servicing works to be undertaken on a planned, cyclical or responsive basis to residential and/or commercial buildings predominantly in the regions of Yorkshire and Humberside, East Midlands and North West England but this may extend to other areas of the UK. Call offs under the framework may be undertaken on a on a single stage or multi-stage call-off basis, with provisions for early contractor involvement.
The scopes of the framework includes (but not limited to) the following items:
- refurbishment, maintenance, repairs and/or minor construction works (including extensions/rebuilding etc) to various property types, including residential and mixed use developments including commercial or public infrastructure buildings/assets,
- installation and using of different traditional and modern building technologies and energy
efficiency solutions in line with the current standards,
- making minor building, infrastructure, planned, remedial repair and reactive maintenance works
- Works to prepare void properties for relet
- Servicing, inspection, testing and maintenance of electrical and mechanical systems
- Works to prepare void properties for relet
The contractors will be expected to complete the works to a high standard and are expected to share ENP's commitment to regeneration, specifically the creation of training, work placement, educational activity, direct and shared apprenticeship, and new employment opportunities. Over the term of the framework ENP will expect contractors to develop their own ESG strategies as appropriate to bring wider benefits to ENP and members. Contractors will be required to interact with, and source certain materials from, the suppliers who are appointed to other framework agreements utilised by ENP members (which are each subject to a separate procurements and Contract Notices).

Similar Contracts

Open

Ardersier Port, Phase 2 - Quay Civils (300m)

Quayside Civils (These works are the focus of this PQQ) - Setting up principal contractor welfare area including all temporary service connections, - Breaking out and disposal of concrete guide walls following installation by quay wall contractor, - Removal of piling mat, installed by Others, - Cropping of diaphragm wall to cut off level. - Reinforced concrete capping beams, to both quay and anchor wall, with a design life of 100 years to tie in with the Phase 1 quay, Including the supply and installation of all quay furniture cast in elements. - Removal of existing sheet pile quay wall, anchor wall and tie rods. - Excavation to tie rod level, approximately +0.0mCD, including dewatering system to facilitate, - Installation of tie rods (free-issue) between quay and anchor walls, - Backfilling above tie rods to formation level using site-won material, - 100m wide quay apron along the entire length of the new quay including capping layer and unbound stone pavement, - 250kPa uniform loading capacity, - Finished level of +6.5mCD (varies depending on drainage falls), - Installation of temporary and permanents sheet piles, - Infiltration drainage system with trenches as required, - Quay furniture including flexible mooring and berthing equipment such as pneumatic fenders, removeable bollards, and safety equipment inclusive of all associated cast in items, - Instrumentation and monitoring equipment associated with the quay wall. - Upgrades to the existing quayside which extends east beyond the new Phase 2 300m diaphragm wall and apron by approximately 758m, whilst retaining the existing quay wall, to extend the usable quayside (dredged by others). There will be a requirement for the Contractor to coordinate elements of works with the Clients quay wall and landside civils principal contractors. There is potential for the works to be varied to extend the new quay wall and quay wall civils further than the initial 300m.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mr István Baranyi

[email protected]

+44 3306061460

Timeline unknown