Energy Efficiency Project - Installation of Solar PV System

Complete

Value

£1,000,000

Classifications

  • Solar panels

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

Installation and upgrade to our solar PV systems at our Bispham and Fleetwood campuses across 14 buildings and 28 roof spaces. 

Solar PV array to include the following in line with the subsequent specification: 

- Supply and installation of PV system including mounting
- Arranging AC connection points for PV system
- PV mounting system
- PV modules
- PV inverters
- AC cables & isolators
- DC cables & isolators
- 3 phase MCB & AC cable
- Feed-in tariff metering
- Commissioning testing and handover documentation
- Systems warranty (see award criteria)

Tender documentation and bidding will be undertaken via our InTend Portal

https://in-tendhost.co.uk/blackpoolandthefylde/aspx/Home

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Decarbonisation Framework

This Framework is being procured by Places for People Group and Procurement Hub for the benefit of itself and its Members. This Framework is available for use by public sector bodies (and their statutory successors) as defined in the Procurement Act 2023 and additionally listed online at: http://www.procurementhub.co.uk/eligibility-criteria/ The decarbonisation Framework is designed to support the delivery of retrofit and energy efficiency measures across Places for People’s domestic assets as well as Procurement Hub members. This represents an entirely new framework, designed to ensure that PfP has access to a robust supply chain of qualified and experienced service providers. It is necessary to meet statutory obligations under the Future Homes Standard and to support PfP’s carbon reduction commitments. PfP is recipient of grant funding streams, and the framework will establish specialist delivery mechanisms and supply chain to capitalise on further future funding. Multiple entities within the Places for People Group will have a requirement for the works covered, including Places for People Homes, Procurement Hub, Future Homes Consortium and Origin Housing. Decarbonisation framework for a range of consultants and contractors to provide services and works to decarbonise housing stock. The framework will include, but is not limited to, the following works and services: •Consultants, admin & ancillary •External wall insulation •Internal wall insulation & linings •Loft, Cavity wall & miscellaneous insulation •Underfloor insulation •Windows & Doors (upgrade to higher u-value, triple glazing etc) •Ventilation •Air & ground source heat pumps •High heat retention (HHR) electric heating •Solar PV & battery storage •Heating & hot water controllers •Low energy lighting To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=966751826

Katy Reed

Published 2 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete