East Common Lane, Scunthorpe

Award

Value

£5,311,550

Suppliers

Classifications

  • Construction work

Tags

  • award

Submission Deadline

2 years ago

Published

2 years ago

Description

Direct Award call off from EN:Procure New Build Framework Lot 2. OJEU reference:2019/S 238-582841

28 Homes for Ongo Homes Ltd at East Common Lane, Scunthorpe

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Marston BBM Scheme

"The main contracted works is for the construction of a new overbridge (Marston Road Overbridge) to facilitate the decommissioning of the current Marston Road Level Crossing. The Level Crossing is situated on the Bletchley and Bedford Midland Line (BBM) @ 9m 02ch. The scope of the works is the construction of the new bridge and assosciated works as per the current Form 2 Design. Works involve but not limited to the following: The works to be carried out include but not limited to the list below: 1. Consultation with stakeholders to agree the level of welfare provision, access arrangements, service diversions and other works necessary to enable commencement of the works. 2. Undertaking of enabling works to create a worksite suitable for the works. 3. Temporary Works development to enable permanent works construction. 4. Installation of the new drainage ditch either side of the new highway. Pipework, chambers, under track crossing, and headwall structures for the underground culvert diversion on the East side of the existing road alignment. 5. Construction of the piled foundation & pile caps either side of the railway lines to support the installation of the new abutment, wingwalls and restraint barriers. 6. Construction of the bridge abutments, cills and wingwalls. 7. Procurement and fabrication of beams, approach units, bearings, parapet, waterproofing and surfacing of the of the new bridge structure. 8. Installation of approach embankments to the abutments with engineered material combined with the installation of deck drainage and highway drainage to outfall. 9. Construction of the embankment slopes and ancillary highway infrastructure including carriageway, white lining, verges, tie-ins, footpaths, approach safety barriers, fencing and service ducting from Chainage 10m to Chainage 540m as per Form F (180940-MUR-ZZ-XX-DRG-EHW-000). 10. Diversion and reinstallation of the Statutory Services (Anglian Water, Cadent Gas, UK Power Network, Openreach (BT)) in the new highway overbridge infrastructure. 11. Installation of cable troughs, and chambers on under track crossings for systems cabling. 12. Telecommunications related modification works. 13. E & P related modification & installation works. 14. Signalling related modification works. 15. De-vegetation and landscaping works as per the ecological and landscape design documentation. The stating date for the Main Contract Works was [insert] and the completion date for the whole of the Main Contract Works is [insert] "

Open

Woburn BBM Scheme

The Main Contract works is for the construction of a new footbridge (BBM 9G Woburn Road footbridge bridge) to facilitate the decommissioning of the current Woburn Road Foot Crossing. The current Foot Crossing is situated on the Bletchley and Bedford Midland Line (BBM) @ 14m 10245Yds. The scope of the works is the construction of the new bridge and associated works as per the current draft AFCs. The works to be carried out include but not limited to the list below: 1. Consultation with stakeholders to agree the level of welfare provision, access arrangements, service diversions and other works necessary to enable commencement of the works. 2. Procurement and fabrication of columns, steps, intermediate landing areas and main span of the footbridge, as well as, waterproofing and footway surfacing of the of the new structure. 3. Design and construction of any temporary works require to complete scope. 4. Undertaking of enabling works to create a worksite suitable for the works. 5. Diversion of the existing drainage ditch, into a new piped system for a total of up to 40lm, complete with Soluform Pre-filled concrete bag works headwalls on either end. 6. Construction of the piled foundation & pile caps either side of the railway lines to support the installation of the new steel Circular Hollow Section (CHS) columns 7. Construction of landing areas for access/egress onto and off steps 8. Installation of CHS columns, steps, intermediate landing areas and main span of the footbridge. 9. Installation of spider plate for future bonding provision. 10. Closure of existing foot crossing. 11. Installation of new boundary fence. 12. Installation of new footpaths on approach to structure. The indicative stating date for the Main Contract Works is January 2025

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete