Electrical Installation Condition Reporting

Award

Value

£1,800,000

Classifications

  • Electrical services
  • Energy and related services

Tags

  • award
  • contract

Published

1 year ago

Description

The contract is for the periodic inspection, testing and certification of electrical installations to determine, so far as is reasonably practicable, whether the electrical installation is in a satisfactory condition for continued service.
The electrical contractor will be required to undertake the work in accordance with the latest versions of the following documents:
•	BS7671, Requirements for Electrical Installations, IET wiring Regulations, 
•	Electricity at Work Regulations 1989, 
•	IET's guidance note No3 - Inspecting and Testing and 
•	Best Practice Guide No4 - Electrical Installation Condition Reporting - published by Electrical Safety First.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

LOCAL AREA ENERGY PLAN FOR NORTH NORTHAMPTONSHIRE

The purpose of the commission is to advance the Net Zero goals and ambitions of North Northamptonshire. North Northamptonshire Council (NNC) are looking to appoint a suitably qualified consultant to produce a Local Area Energy Plan (LAEP) for North Northants. The LAEP will be an integral part of the Roadmap to Net Zero Action Plan and new Local Plan for the North Northants area. This energy strategy is critical as it will underpin the Council's climate emergency response and act as a framework to inform policy, planning, investment, and wider collaboration with key stakeholders to deliver Net Zero targets, including through the Big50 initiative. The LAEP should include a comprehensive emissions assessment of the built environment (all categories of domestic, non-domestic, commercial, and industrial buildings) and relevant aspects of the transport sector; science-based targets for emissions reduction, to include interim milestones and sector-specific targets. This includes both existing and planned development and other proposals. It will integrate insights from the North Northamptonshire to Net Zero (NN2NZ) project and the Local Plan evidence base and should be produced in conjunction with key stakeholders from the energy sector. NNC has procured baseline Net Zero data from the Energy System Catapult, the successful Supplier will be expected to use this data which pertains to stages 1-3 of the LAEP. Funding of up to £85,000 is available to support the creation of the LAEP, including stakeholder engagement. The contract will comprise an eight-month delivery programme.

Katy Reed

Published 5 days ago
Open

LOCAL AREA ENERGY PLAN FOR NORTH NORTHAMPTONSHIRE

The purpose of the commission is to advance the Net Zero goals and ambitions of North Northamptonshire. North Northamptonshire Council (NNC) are looking to appoint a suitably qualified consultant to produce a Local Area Energy Plan (LAEP) for North Northants. The LAEP will be an integral part of the Roadmap to Net Zero Action Plan and new Local Plan for the North Northants area. This energy strategy is critical as it will underpin the Council's climate emergency response and act as a framework to inform policy, planning, investment, and wider collaboration with key stakeholders to deliver Net Zero targets, including through the Big50 initiative. The LAEP should include a comprehensive emissions assessment of the built environment (all categories of domestic, non-domestic, commercial, and industrial buildings) and relevant aspects of the transport sector; science-based targets for emissions reduction, to include interim milestones and sector-specific targets. This includes both existing and planned development and other proposals. It will integrate insights from the North Northamptonshire to Net Zero (NN2NZ) project and the Local Plan evidence base and should be produced in conjunction with key stakeholders from the energy sector. NNC has procured baseline Net Zero data from the Energy System Catapult, the successful Supplier will be expected to use this data which pertains to stages 1-3 of the LAEP. Funding of up to £85,000 is available to support the creation of the LAEP, including stakeholder engagement. The contract will comprise an eight-month delivery programme.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Darren Holloway

[email protected]

+44 1225715971

[email protected]

+44 1225715971

Timeline complete

Publish
Bid
Evaluate
Award
Complete