HHP Investment Works Framework 2023 - 2029

Award

Value

£1,884,710

Classifications

  • Houses construction work
  • Windows, doors and related items
  • Windows
  • Window frames
  • Installation of doors and windows and related components
  • Installation of door and window frames
  • Installation of window frames
  • Installation of doors and windows
  • Installation of windows
  • Doors
  • Door frames
  • Door thresholds
  • Fire doors
  • Installation of door frames
  • Heating equipment
  • Central-heating equipment
  • Central-heating radiator valves
  • Plumbing and heating materials
  • Heating materials
  • Central-heating radiators and boilers and parts
  • Central-heating radiators
  • Central-heating boilers
  • Heating works
  • Electrical installation work of heating and other electrical building-equipment
  • Central-heating installation work
  • Plumbing materials
  • Plumbing and sanitary works
  • Water plumbing work
  • Baths
  • Bathrooms construction work
  • Kitchen furniture and equipment
  • Fitted kitchens
  • Installation of fitted kitchens
  • Roof
  • Roof frames
  • Roof supports
  • Roofing materials
  • Roof works and other special trade construction works
  • Roof-covering and roof-painting work
  • Roof-covering work
  • Roof-tiling work
  • Roof-slating work
  • Masonry work
  • Electrical materials
  • Electrical accessories
  • Electrical installation work
  • Electrical wiring and fitting work
  • Electrical wiring work
  • Electrical fitting work
  • Other electrical installation work
  • Fences
  • Fencing components
  • Erection of fencing
  • Footpath construction work
  • Surface work for footpaths
  • Ground-drainage work
  • Building construction work
  • Shower basins
  • Stairlifts
  • Access ramps
  • Installation of doors
  • Heating, ventilation and air-conditioning installation work
  • Waterproofing work
  • Electrical supplies and accessories
  • Electrical components
  • Foundation work for footpaths
  • Thermal insulation work
  • Roof insulation work
  • Insulation work

Tags

  • award
  • contract

Published

2 years ago

Description

Hebridean Housing Partnership (HHP) is seeking to establish a multi lot, multi supplier framework to deliver its Investment Works programme for 2023 – 2027. HHP intend to appoint up to a maximum five contractors per Lot of the framework.
The framework geographical delivery locations are: Lewis, Harris, Uists and Barra.
The framework covers the following types of work across 18 lots:
- Windows & Doors
- Heating
- Bathrooms
- Kitchens
- Roofing & Roughcast
- Electrical
- Environmental
- Occupational Therapy
- Energy Efficiency

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

MKCC Fire Door Replacements

Milton Keynes City Council (the Council) are required to meet all statutory obligations in relation to our Housing stock. The Housing stock asset management function is controlled by the Council's Housing Maintenance and Investment (HMI) team. The Council are currently out to tender for the provision of Fire Door replacements for block properties, including dwelling entrance, internal communal, service cupboard doors, and loft hatches. All sites are within the Milton Keynes postal code region. Any sites which fall outside of this region will be advised in the mobilisation period. The Council proposes to enter into a contract that will be for an initial term of 2 years with an option for the Council to extend for 2 years with the successful tenderer (Service Provider) unless terminated in accordance with the Conditions of Contract. The estimated value for Fire Door Replacement contract is £5.75M (ex. VAT) for the maximum potential contract period of 4 years. The spend under the contract is dependent on the quantities of installations ordered during the term of the Contract. The estimated value is indicative only, and the Council does not guarantee to Tenderers the volume of installations ordered. The Council has not engaged with the market prior to issuing the ITT as it has already developed the most appropriate specification for the works they require to be procured. The requirements for Fire doors are set out in Building Regulation (Fire Safety: Approved Document B), and other legislation with robust British Standards in place for the testing and certification of fire doors and therefore there is a robust specification in place meeting the Council's needs.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 3001230773

+44 1851700811

+44 1851702063

Timeline complete

Publish
Bid
Evaluate
Award
Complete