Chamber House Solar Farm EPC Contract (ERDF)

Unknown

Value

£0

Classifications

  • Construction work

Tags

  • tenderUpdate

Published

2 years ago

Description

Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF
The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Local Electric Vehicle Infrastructure (LEVI) fund - Electric Vehicle Charge Point Network - Concession Contract on The Isle of Wight

The Authority has been awarded £1.625m LEVI funding from the Office of Zero Emission Vehicles (OZEV) through the Local Electric Vehicle Infrastructure (LEVI) fund. Based on that funding the Authority is now seeking to award a single concession contract for a supplier to install and operate an affordable and easy to use, reliable and widely accessible and recognisable Electric Vehicle (EV) charge point network across the Isle of Wight (the 'Contract') The form of contract has been developed in alignment with the LEVI Heads of Terms. The Authority will be looking for a Supplier who can demonstrate a commitment to maximising the use of the LEVI funding and deliver an ambitious project with a full solution offering end to end services. It would be the intention that the successful supplier would invest its own resources, to be used in conjunction with the LEVI funding, to significantly increase the number of public chargepoints available on the public highway network across the island. The project will involve the deployment of local, primarily low powered on street charging infrastructure which must focus on locations that serve residential communities and those residents that do not have access to off road car parking. The Supplier will be required to deliver all aspects of the goods, services and works needed for the Project, which will include purchasing relevant Electric Vehicle Charging Infrastructure (EVCI), connecting it to the grid and maintaining, upgrading and managing the operation of the chargepoint network across a 15-year term. Full details can be found in the accompanying Tender Pack

Katy Reed

Published 2 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline unknown