Enabling works for the MOD2 Control Room.

Complete

Value

£45,000

Classifications

  • Electrical wiring and fitting work

Tags

  • tenderAmendment

Submission Deadline

2 years ago

Published

2 years ago

Description

The Provision of Builders work, mechanical and electrical services to reorganise the current office layout in a Modular Building known as MOD2 including alterations to the wet Central heating system, provision of a new HVAC unit, alterations to office layouts, construction of a new partition wall  and alterations to associated electrical and data services.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Jenner Building CO2 Detection System Replacement

The contract is for a single supplier to provide Design and Build of a New CO2 Detection System in The Jenner Building as per the User Requirement Specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the existing CO2 detection system so it remains available to operate, safe, reliable and will serve the building for a minimum of 15 years. The scope of works will involve: • Detailed design work for the new CO2 Detection system, as per the URS, including drawings showing the exact location and configuration. • Supply, manufacture, delivery, installation, commissioning and certification of new CO2 Detection System • Removal & disposal of existing CO2 detection system and submission of all waste certificates to The Pirbright Institute. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete