Ebbsfleet Central East - Site Wide and Area Masterplan - AWARD

Award

Value

£0

Classifications

  • Architectural, construction, engineering and inspection services

Tags

  • award

Submission Deadline

3 years ago

Published

2 years ago

Description

EDC is planning to procure a masterplanning and design team to lead the next stages of design for Ebbsfleet Central, the urban centre of Ebbsfleet Garden City located on the land around Ebbsfleet International train station. This stage of design work will follow the approval of an outline planning application for the site, Ebbsfleet Central East, including circa 2,100 homes, 100,000m2 of commercial development, specialist health facilities, new public realm and open space and community spaces.  The first phase of development at Ebbsfleet Central East is envisaged to comprise circa 1,100 homes and 80,000m2 of commercial development and supporting retail, leisure and community space.  
      
      The commission will be split into the following core key areas of work:
      o Development of a Site Wide Masterplan for the full Ebbsfleet Central East outline application area; 
      o Development of an Area Masterplan and Design Code for Phase 1 of the Ebbsfleet Central East application area;
      
      Further areas of potential work which may be required, and will be drawn down if required include:
      o Development of an Area Masterplan and Design Code for Phase 2 of the Ebbsfleet Central East application area. 
      The Masterplan & Design Team will lead the next stages of design for Ebbsfleet Central East and work alongside EDC and a wider consultant team to discharge key masterplanning conditions. This will include (but are not limited to):
      o Develop the next stages of masterplan design which meets the vision and aspirations of EDC for Ebbsfleet Central; 
      o Development of a site wide masterplan which identifies the broad location and disposition of all land uses, major open spaces, new and retained landscaping, road routes, principal footpaths and cycle routes and public transport networks; 
      o Development of an area masterplan and design code for Phase 1 of the development which builds on the site wide masterplan to deliver a detailed masterplan and design code. This is likely to include (but is not limited to) detail on:
      o Land Use - uses and maximum floorspaces, indication of affordable housing and land for community and education uses and open space; 
      o Phasing - general phasing for the area, indication of where development is likely to start, timing of key elements of the proposals such as bus stops, local centres, links to adjacent communities and community facilities; 
      o Land Forming - details of final ground levels and interface with existing ground levels; 
      o Form of Development and Design - extent of development and density, building height ranges, location of landmark buildings and features, cross sections of key streets, building and open space, boundary treatments and identification of broad design character areas to guide more detailed area design codes; and,
      o Access and Car Parking - access routes for vehicles, public transport, pedestrians and cycles and connections to wider areas, car parking standards, typologies, dis...

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Supply Chain Partners (Trades) Framework

Wandle Housing Association is responsible for the repair and maintenance of the building(s) and services in accordance with Schedule 6 paragraph 14 of the Housing Act 1985, and in accordance with the landlord's covenants of leases. Wandle Housing Association will establish an Open Framework for the provision of trades. The Framework will be spilt into three (3) Lots Lot 1 - Responsive Repairs Lot 2 - Major Works (Voids and Disrepairs) Lot 3 - Damp and/or Mould (Works and Surveys) The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Wandle is expanding its delivery model for responsive repairs, major works and damp and mould survey and remediation works. Upon commencement of this Framework, Wandle intends to award relevant works and services contracts under this Framework via its new job management system, Total Mobile. Suppliers (whether currently engaged with Wandle or not) are encouraged to submit a Framework submission, in line with the requirements of the specification per Lot. PLEASE NOTE: Drop in sessions are available to suppliers (via Teams) to allow for queries relating to getting set up on ProContract, or how the new "open" Framework will operate. Please review the clarification question within the the messaging function of the project within ProContract.

Katy Reed

Published 8 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete