Refurbishment Works for CoTIE II

Award

Buyers

Value

£442,685

Classifications

  • Construction work
  • Construction work for buildings relating to education and research
  • Construction work for college buildings

Tags

  • award
  • contract

Published

2 years ago

Description

Refurbishment works for an ERDF funded development of the second phase of a Centre of Technology and Innovation Excellence at Petroc North Devon Campus.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5391 - Blackwood Comprehensive School – Ventilation Works

You are invited to submit a tender for the installation of ventilation units and boxing in of heating pipes. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - The contractor shall be responsible for the removal and reinstatement of any loose and fixed furniture to allow the installation of all ventilation services and equipment as shown on the drawings. - Form new openings in the existing structure to allow the installation of the new external weather louvres - Carefully take down and reinstate any false ceilings to allow the installation of the new ventilation systems. Any damaged or stained ceiling tiles shall be replaced with new to match existing. - Install all of the new ventilation equipment and ductwork as shown on the tender drawings including all necessary wiring and controls. - Employ specialist commissioning engineers to set to work all new ventilation systems in accordance with the manufacturer’s requirements and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. - Supply & install ventilation units, ducting and ancillary grilles/louvres, etc - Insulate & box-in exposed heating pipework - Electrical supplies to new equipment - Controls work & commissioning - Associated Builders Work - Provide O&M manuals and provide user training - The timescale for the work is 6 weeks from commencement of the contract. - Contractors shall note that the maximum time the school can be closed for is 6 weeks and if they cannot complete the work detailed in that time then they should not submit a tender proposal. - Works to be completed by 30th August 2025 - Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the contract period.

Katy Reed

Published 15 minutes from now
Open

5466 - Greenhill Primary School - Boiler Replacement

You are invited to submit a tender for the provision of new boiler plant in the boiler room at Greenhill Primary School. The scope of the project is fully described in the ITT and supporting documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period - Carefully survey all services in the existing boiler rooms and remove all redundant mechanical and electrical services including any brackets and containment. When removed, the building structure shall be made good. - The contractor shall install and set to work the new boilers and flues and configure existing controls for the new boilers. All new and existing services within the boiler room are to insulated as specified. - The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certify them. The timescale for the work is 4 weeks from commencement of the contract. It is planned to carry out these works during the summer vacation 2025 which commences on the 21st July and ends on the 29th August. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 4-week period given.

Katy Reed

Published 8 minutes from now
Open

5288 - Fochriw Primary School - Boiler Replacement

You are invited to submit a tender for the provision of new boiler plant in both the Junior and Infants buildings at Fochriw Primary School. - The scope of the project is fully described in the ITT and supporting documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - Carefully survey all services in the existing boiler rooms and remove all redundant mechanical and electrical services including any brackets and containment and all existing plant bases. The existing entrance door and high level louvre shall be removed and replaced as specified When removed, the building structure shall be made good and a new steel door set and steel louvre shall be installed. - The contractor shall install and set to work all new plant and configure existing controls generally as shown on the tender drawing. All new and existing services within the boiler room are to insulated as specified. - The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certificate them. - Employ specialist commissioning engineers to hydraulically balance all system and sub circuits, and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. - The timescale for the work is 6 weeks from commencement of the contract. Contractors shall note that the maximum time the school can be closed is 6 weeks and if they cannot complete the work detailed in that time then they should not submit a tender proposal. - Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 6-week period given.

Katy Reed

Published 5 minutes from now

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete