Installing replacement bridge and culvert over River Esk to improve fish passage and natural river f

Complete

Value

£250,000

Classifications

  • Construction work

Tags

  • tender

Submission Deadline

2 years ago

Published

2 years ago

Description

The key objectives of the contract are to construct 2 new water crossings to replace existing obstacles. All works must be completed before the end of June 2023 to align with
project funding arrangements.
REPLACEMENT BRIDGE CROSSING, River Esk
The works comprise of installing a new bridge crossing over the River Esk on a private farm road to
Crag Farm. The existing bridge will remain in place as the main vehicular access to Crag Farm until the new bridge is completed and the approach roads reinstated. Then the existing bridge will be removed and the river channel reinstated to a form similar to conditions upstream.
The existing bridge over the River Esk (Esk 9a) provides the only vehicular means of access to Crag Farm and it must remain open throughout the works to allow milk tankers and routine farm traffic to access the farm, as well as emergency vehicles. A Traffic Management Plan will be required to be agreed with Crag Farm (who are supportive of the works).
The Esk 9a bridge is a Public Bridleway, however this designation will be subject to a temporary closure order arranged by the NYM NPA for the duration of the works to prevent public access.
When the new bridge is installed, the existing bridge is to be removed. Due to the bridge removal requiring direct works in the river, these works cannot commence prior to 22nd May 2023 (subject to confirmation) due to emergence of juvenile fish in the river.
All activities will require installation of appropri...erosion protection comprising riprap stone at toe of bank (approx. 30 m3), rock rolls (approx. 60 m), at lower levels, and addition of biomatting (to be anchored and pinned) (approx. 120 m2), at upper bank levels and at top of bank.
REPLACEMENT CULVERT, Little Fryup Beck
The works comprise of the replacement of an existing twin pipe culverted crossing of a private farm track over the Little Fryup Beck with a 4m span multi-plate bottomless arch culvert:
1. Remove existing culverts and re-grade the bed of the Beck to remove the upstream build-up of sediment;
2. Cast in-situ/precast strip foundations, incorporating arch seating channel (or with fixing/load transfer system to Contractor's design, to equivalent performance);
3. Reinstate the channel bed with stone, as per design specification;
4. Re-form the channel bed between the abutments using placed stone;
5. Assemble multiplate bottomless arch culvert from pre-fabricated plates onto strip foundations;
6. Cast in-situ concrete headwall, to tie-in to foundations and steel arch;
7. The BAC shall receive compacted fill in layers to the sides and above the crown of the arch, with a C40 fibre concrete running surface formed;
8. Place rock armour to provide a tie in between the concrete headwall and reprofiled banks upstream at culvert inlet and outlet;
9. A pedestrian handrail to be fixed to the headwall;
10. The track will be reinstated either side of the culvert with a compacted stone fill running surface.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Refurbishment of St Christopher's Hall Dobbs Weir Road Hoddesdon EN11 0AZ

INVITATION TO TENDER Under the terms of the Audit Regulations and the Councils Standing Orders, the Council is required to seek 3 quotations. Tenders Are invited from suitably qualified and experienced providers to deliver the following works. Full details and plans are available on the Contracts Finder website Project Background St Christophers Hall was built by the villagers of Dobbs Weir in 1939. The nearest parish hall was in Roydon, which was a long walk for the Dobbs Weir Community, so they built the hall to allow fellowship and act as a meeting point for villagers. The villagers passed it over to the Diocese of Chelmsford for safekeeping and to look after which is how it remained for some 70 years. Around 15 years ago the Church decided that they wished to sell the land for development. The people of Dobbs Weir fought strongly against this and Roydon Parish stepped in to purchase the hall and the land for £50k using public funds. Unfortunately, since 2013, there has been no maintenance or development to the Hall and as a result the Hall is now in dire need of essential work to maintain its usage to meet safety requirements. The hall was built on a timber frame with a large main area, toilets, a small stage, and a kitchen area. It has outside space and parking facilities. The building hasn't altered in some 80 years and the general layout is still satisfactory, but the building is now in desperate need of refurbishment, to prevent it falling into disrepair and to bring it up to modern day safety standards. Project There are a number of elements to the renovation and once tenders are available, the Parish Council will decide if all or part of the project will go ahead. The elements are as follows: • Remove walls, roof and outer body of hall to strip back to wooden frame. Remove the low grade asbestos. Rebuild timber walls, renew tile roof, guttering, soffits, replace all windows and external doors with double glazed units. Insulate the whole building and partition the interior to form: kitchen, male & female toilets, disabled toilet with baby changing cubicle. Clad bottom half of exterior of building with wood effect low maintenance cladding. Remove current floor, insulate and renew subfloor. Renew electrics, renew plumbing and install electric heating and exterior lights. • Fit out interior, to include new kitchen, male, female and disabled toilets with hand basins, wc's, tiling, hand dryers, lay flooring in all rooms, install new lighting, door furniture, paint Accompanying documents Specification and drawings Building Regs approval Asbestos report Project costs The Parish Council will need detailed quotes to meet the objectives of Part 1 and Part 2 separately. The construction approach will need to be optimized to meet the project objectives, and the Council will be open to the possibility for some finishing items to be carried out by the community such as painting/kitchen fitting etc. The Parish Council does not have unlimited funds for this project, so it is important that quotes include a contingency. The Council have been advised that the full refurbishment cost will be in the region of 120k. Tender Submission Requirements The following should be submitted as part of this tender submission: • Full costing proposal - setting out quotes for each of the project elements, contingency and total cost (scoring percentage 50%) • Reasonable commuting distance to Dobbs Weir (scoring percentage 25%) • Document setting out experience in working on similar projects (scoring percentage 25%) to include: • Company structure, any subcontractors or other personnel who would work on the project • Company information, time in business etc • Evidence of delivering work on time and to budget • Reviews/testimonials from previous commercial clients • Location and photos of previous similar work carried out • Indication of timescale for each project element, indicating the total timescale for the whole project Important Information Works are ideally to commence in May 2025 and take no longer than 3 months. This is negotiable Tender Process All plans and documents can be viewed on Contracts Finder - GOV.UK (www.gov.uk) The site may be viewed via prior arrangement with the Parish Clerk Any points for clarification can be submitted to the Parish Clerk No contact is to be made with any Councillor during the tender period Tenders should be submitted no later than 20th May 2025 in a sealed envelope stating "Confidential Tender - St Christophers Hall" on the front to the address below or alternately submitted via the Contracts Finder website. Tenders should include a copy of your Public Liability Insurance, PPE Policy and evidence of any related accreditations. Please include any guarantees that will be given after work is completed and any after sales service included Bidders will be notified of the outcome by 9th June 2025. Health & Safety/Operation Staff employed to work on the contract must be fully trained, be aware of risks associated with working in the public domain and must adhere to codes of conduct and working practices. The Hall will be closed to the public during the works. Suitable hoarding will need to be used, and all waste removed from site using correct methods and licenses/permits

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete