Expression of Interest - Pre tender selection for replacement fire alarm system at the Radbourne Unit, Royal Derby Hospital site

Award

Value

£125,000

Classifications

  • Installation services of fire protection equipment

Tags

  • award

Submission Deadline

5 years ago

Published

5 years ago

Description

This is a pre-tender notification for expression of interest. Contractors will be selected from a list of those expressing an interest based upon experience and suitability. Tendering contractors must be experienced in the installation of Honeywell GENT fire alarm systems and be Gent 24 Approved Elite Systems Integrators or better.
 The works are the installation of a replacement fire alarm system in accordance with HTM 05-03, British Standards and the electrical consultant design drawings and specification and decommissioning/ removal of the existing fire alarm system and making good following new installation at the Radbourne Unit, Royal Derby Hospital site, Derby.
 Based on the Royal Derby Hospital site, the Radbourne Unit is the Trust's main inpatient service for Derby and South Derbyshire residents with acute mental health needs. The Radbourne Unit consists of four adult acute inpatient wards called Ward 33, Ward 34, Ward 35 and Ward 36, an enhanced care ward (ECW), an OT hub, ECT suite, a mother and baby unit and supporting offices and education centre.
 Works will be carried out in 'live ward' environments throughout the installation. No lone working is allowed in any areas and tendering contractors will have to demonstrate experience of working in similar mental health care environments.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Active Fire Framework 2025

The scope of this Framework Agreement is for the provision of active fire products and services. The Framework will cover, but is not limited to: •Risk assessments; inspections; fire equipment testing; and portable appliances testing •Fire products including fire detectors; manual and automatic action products; and fire-retardant products •Servicing and maintenance; fire safety and remedial works; security and access systems; emergency lighting; fire damper and fire collar maintenance; and minor works and servicing. The products and services shall fall into 4 separate Framework “LOTs”, further broken down into Sub-Lots, to reflect the structure of the industries. Supply Partners are invited to apply for one or more LOT(s) if applicable. LOT 1: Fire Products- Supply and Installation Sub-Lot 1.1 Fire Detection Sub-Lot 1.2 Smoke Control Systems Sub-Lot 1.3 Sprinkler System Sub-Lot 1.4 Misting System Sub-Lot 1.5 Fire Extinguisher Sub-Lot 1.6 Emergency Lighting Sub-Lot 1.7 Fire Alarm Monitoring Sub-Lot 1.8 Fire Escape Products Sub- Lot 1.9 Defibrillators LOT 2: Consultancy Sub-Lot 2.1 Fire Risk Assessments Sub-Lot 2.2 Fire Risk Inspections Sub-Lot 2.3 Fire Engineering LOT 3: Servicing Sub-Lot 3.1 Fire Servicing and Maintenance Sub-Lot 3.2 Fire Safety, Minor and Remedial Works Sub-Lot 3.3 Emergency Lighting Maintenance Sub-Lot 3.4 Fire Damper and Fire Collar Maintenance Sub-Lot 3.5 Fire Extinguisher Maintenance Sub-Lot 3.6 Maintenance of Defibrillators Sub-Lot 3.7 Fire Escape Products Maintenance Sub-Lot 3.8 Sprinkler Systems Service and Maintenance Sub-Lot 3.9 Misting System Service and Maintenance LOT 4: Fully Managed Service To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=969251536

Katy Reed

Published 1 month ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete