Description

You are invited to submit a tender for the Provision of Refurbishment to External and Communal Areas at 1-40 Boundary Court, 1-9, 10-19, 20-28 Yew Tree Road and 1-9 Tynedale Place, Blackpool.  These are existing blocks of flats that have become outdated due to poor thermal insulation, which is a consequence of some outdated designs leading to cold bridging, heat loss and penetrating dampness.
BCH has identified the issues with the properties and has decided that refurbishment is more cost effective than demolition.  The refurbishment is also an opportunity to introduce some unique design features to give the scheme an individuality and to provide a more desirable and homely appeal to Blackpool Coastal Housing's residents.                                                                                                   Tender documents available: https://procontract.due-north.com/Advert?advertId=59fa9bef-1c12-eb11-8105-005056b64545

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Sarah Gordon

[email protected]

+44 1253478373

Timeline complete