ICT Solutions and Supply of Network Infrastructure

Award

Value

£317,197

Suppliers

Classifications

  • Installation services (except software)

Tags

  • award

Submission Deadline

4 years ago

Published

4 years ago

Description

ICT Solutions and Supply of Network Infrastructure - To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA299815. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA299815 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Local Electric Vehicle Infrastructure (LEVI) fund - Electric Vehicle Charge Point Network - Concession Contract on The Isle of Wight

The Authority has been awarded £1.625m LEVI funding from the Office of Zero Emission Vehicles (OZEV) through the Local Electric Vehicle Infrastructure (LEVI) fund. Based on that funding the Authority is now seeking to award a single concession contract for a supplier to install and operate an affordable and easy to use, reliable and widely accessible and recognisable Electric Vehicle (EV) charge point network across the Isle of Wight (the 'Contract') The form of contract has been developed in alignment with the LEVI Heads of Terms. The Authority will be looking for a Supplier who can demonstrate a commitment to maximising the use of the LEVI funding and deliver an ambitious project with a full solution offering end to end services. It would be the intention that the successful supplier would invest its own resources, to be used in conjunction with the LEVI funding, to significantly increase the number of public chargepoints available on the public highway network across the island. The project will involve the deployment of local, primarily low powered on street charging infrastructure which must focus on locations that serve residential communities and those residents that do not have access to off road car parking. The Supplier will be required to deliver all aspects of the goods, services and works needed for the Project, which will include purchasing relevant Electric Vehicle Charging Infrastructure (EVCI), connecting it to the grid and maintaining, upgrading and managing the operation of the chargepoint network across a 15-year term. Full details can be found in the accompanying Tender Pack

Katy Reed

Published 12 hours ago
Open

Local Electric Vehicle Infrastructure (LEVI) fund - Electric Vehicle Charge Point Network - Concession Contract on The Isle of Wight

The Authority has been awarded £1.625m LEVI funding from the Office of Zero Emission Vehicles (OZEV) through the Local Electric Vehicle Infrastructure (LEVI) fund. Based on that funding the Authority is now seeking to award a single concession contract for a supplier to install and operate an affordable and easy to use, reliable and widely accessible and recognisable Electric Vehicle (EV) charge point network across the Isle of Wight (the ‘Contract’) The form of contract has been developed in alignment with the LEVI Heads of Terms. The Authority will be looking for a Supplier who can demonstrate a commitment to maximising the use of the LEVI funding and deliver an ambitious project with a full solution offering end to end services. It would be the intention that the successful supplier would invest its own resources, to be used in conjunction with the LEVI funding, to significantly increase the number of public chargepoints available on the public highway network across the island. The project will involve the deployment of local, primarily low powered on street charging infrastructure which must focus on locations that serve residential communities and those residents that do not have access to off road car parking. The Supplier will be required to deliver all aspects of the goods, services and works needed for the Project, which will include purchasing relevant Electric Vehicle Charging Infrastructure (EVCI), connecting it to the grid and maintaining, upgrading and managing the operation of the chargepoint network across a 15-year term. Full details can be found in the accompanying Tender Pack

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

David Barraclough

[email protected]

7872052790

Timeline complete

Publish
Bid
Evaluate
Award
Complete